Laserfiche WebLink
POND F <br />PLAN VIEW <br />SCALE 1" = 40' <br />-f- <br />2.0' <br />6 " -18" RIPRAP <br />10% SLOPE SPILLWAY DETAIL <br />POND F <br />2.0 1 FULL FLOW LEVEL <br />2.0 <br />10.0' <br />EMEGENCY SPILLWAY DETAIL 2% <br />POND F <br />POND F CAPACITIES <br />ACRE - FEET <br />WATER SEDIMENT TOTAL <br />ASBUILT CAPACITY 3.51 0.44 3.95 <br />REQUIRED CAPACITY 3.48 0.26 3.74 <br />MINIMUM CULVERT SIZE <br />DRAINAGE AREA F <br />CULVERT MINIMUM <br />No. DIA. <br />C -F2 42" <br />SIDESLOPE DITCH DETAIL <br />6TICI( <br />5958 <br />EMERGENCY SPILLWAY <br />5956 INLET EL. 5954 <br />FULL WATER EL. 5952.8 <br />5954 <br />- - - - - - - <br />5952 -- - - - - -X <br />1 <br />5950 <br />5948 <br />5946 <br />5944 <br />5942 <br />5940 <br />SECTION A - A' <br />SEDIMENT POND F <br />HORIZONAL SCALE 1" = 20' <br />VERTICAL SCALE 1" = 20' <br />k-0-10' TOP OF EMBANKMENT EL. 5956 <br />MIN <br />S <br />--r7; <br />I I <br />DEER TRAIL DITCH <br />109, <br />�nlll <br />TRAPAZOIDAL CHANNEL <br />HEADWALL <br />FULL SEDIMENT EL. 5944.5 <br />STEEL FLUME SECTION <br />PILE COVER <br />f <br />3' <br />1.3' F] <br />DRAINAGE <br />5980 <br />DRAINAGE AREA F <br />FIRE MTN. CANAL <br />5980 <br />SEE MAP No. 21 -3 FOR LOCATIONS <br />LEFT <br />RIGHT <br />DITCHES: Fl, F2, F3, F5,F6,F8,F10,F12,F13,F17,F18,W. DIV. #2 <br />D -F1 0.6 <br />0.3* <br />DITCH <br />SIDE <br />SIDE <br />D -F3 0.5 <br />FULL WATER EL. 5952.8 <br />EMBANKMENT <br />D -F4 1.2 <br />No. <br />SLOPE <br />SLOPE <br />5970 <br />D -F6 0.7 <br />5970 <br />D -F1 <br />3:1/ <br />20:1/ <br />NOTES: <br />FULL SEDIMENT EL. 5944.5 OUT -SLOPE <br />0.4* <br />10 <br />D -F9 1.1 <br />0.1 <br />D -F2 <br />5:11 <br />20:1 <br />fractured stone as nearly cubical as <br />3.OHA.OV <br />0.2 * <br />0.4 <br />practical. Stone shall be well graded in <br />p g <br />D -F13 1.3 <br />1.0 <br />D -F3 <br />5:1/ <br />20:1/ <br />5960 <br />D -F15 0.4 <br />0.1 <br />stones equal to or larger than the specified <br />D -F16 1.2 <br />- 5960 <br />D -F5 <br />5:1 -' <br />20:1/ <br />riprap size. <br />D -F18 0.8 <br />0.5* <br />UpDivWestl 1.4 <br />0.4 <br />D -F6 <br />5:1/ <br />20:1 /' <br />all riprap. Use Mirafi 60OX or equal. <br />UpDivEast 1.4 <br />0.4 <br />D -F7 <br />2:1 / <br />2:1/ <br />5950 <br />- ----- - - - - -- - <br />DETAIL' TABLE <br />5950 <br />_ <br />ORIGINAL GROUND <br />EFFECTIVE <br />. <br />D -F1i0 <br />5:1/ <br />20:1/ <br />SLOPE 3.OH:1.0V <br />D -F12 <br />5:1/ <br />20:1 / <br />5940 <br />5940 <br />D -F17 <br />5:1/ <br />15:1 � <br />BOTTOM <br />EL. 5944 <br />D -F18 <br />2.5:1 / <br />2.5:1, <br />6TICI( <br />5958 <br />EMERGENCY SPILLWAY <br />5956 INLET EL. 5954 <br />FULL WATER EL. 5952.8 <br />5954 <br />- - - - - - - <br />5952 -- - - - - -X <br />1 <br />5950 <br />5948 <br />5946 <br />5944 <br />5942 <br />5940 <br />SECTION A - A' <br />SEDIMENT POND F <br />HORIZONAL SCALE 1" = 20' <br />VERTICAL SCALE 1" = 20' <br />k-0-10' TOP OF EMBANKMENT EL. 5956 <br />MIN <br />S <br />--r7; <br />I I <br />DEER TRAIL DITCH <br />109, <br />�nlll <br />TRAPAZOIDAL CHANNEL <br />HEADWALL <br />FULL SEDIMENT EL. 5944.5 <br />STEEL FLUME SECTION <br />SECTION B - B' <br />SEDIMENT POND F <br />HORIZONAL SCALE 1" = 10' <br />VERTICAL SCALE 1" = 4' <br />5958 <br />5956 <br />5954 <br />5952 <br />5950 <br />5948 <br />5946 <br />5944 <br />5942 <br />5940 <br />1.1'�FREEBOARD <br />00 FLOW DEPTH <br />1.1' FREEBOARD <br />0.9' FLOW DEPTH <br />1 <br />1.5 <br />T=_ <br />DEPTH <br />3" CHANNEL STIFFNERS ON 48" CENTERS <br />TIE INTO BRIDGE STEEL FOR STABILITY <br />I <br />0.7' F: <br />f <br />3' <br />1.3' F] <br />DRAINAGE <br />EXSISTING RAIL BRIDGE <br />DRAINAGE AREA F <br />FIRE MTN. CANAL <br />SEE MAP No. 21 -3 FOR LOCATIONS <br />DITCH DITCH <br />No. DEPTH <br />FLOW <br />DEPTH <br />DITCHES: Fl, F2, F3, F5,F6,F8,F10,F12,F13,F17,F18,W. DIV. #2 <br />D -F1 0.6 <br />0.3* <br />SECTION B - B' <br />SEDIMENT POND F <br />HORIZONAL SCALE 1" = 10' <br />VERTICAL SCALE 1" = 4' <br />5958 <br />5956 <br />5954 <br />5952 <br />5950 <br />5948 <br />5946 <br />5944 <br />5942 <br />5940 <br />1.1'�FREEBOARD <br />00 FLOW DEPTH <br />1.1' FREEBOARD <br />0.9' FLOW DEPTH <br />1 <br />1.5 <br />T=_ <br />DEPTH <br />3" CHANNEL STIFFNERS ON 48" CENTERS <br />TIE INTO BRIDGE STEEL FOR STABILITY <br />I <br />Steel Flume <br />SLOPE MAY BE CUT OR FILL <br />DEPENDING ON LOCATION <br />to] <br />:5:Cil <br />SOW DEPTH <br />�- 11 <br />1.5 <br />MIRAFI 60OX OR EQUAL--/ � RIPRAP <br />TRAPEZOIDAL CHANNEL DETAIL <br />DRAINAGE AREA F <br />DITCHES: F4,F7,F9,F11,F14,F15,F16,WEST DIV. #1 & EAST DIV. ** <br />* *EAST DIV. bottom width = 2.0' <br />WIDTH - <br />FULL FLOW_ LEVEL <br />DEPTH 1I <br />1.5 <br />0.3' FREEBOARD <br />FLOW DEPTH <br />MINIMUM <br />0.7' F: <br />f <br />3' <br />1.3' F] <br />DRAINAGE <br />Steel Flume <br />SLOPE MAY BE CUT OR FILL <br />DEPENDING ON LOCATION <br />to] <br />:5:Cil <br />SOW DEPTH <br />�- 11 <br />1.5 <br />MIRAFI 60OX OR EQUAL--/ � RIPRAP <br />TRAPEZOIDAL CHANNEL DETAIL <br />DRAINAGE AREA F <br />DITCHES: F4,F7,F9,F11,F14,F15,F16,WEST DIV. #1 & EAST DIV. ** <br />* *EAST DIV. bottom width = 2.0' <br />WIDTH - <br />FULL FLOW_ LEVEL <br />DEPTH 1I <br />1.5 <br />0.3' FREEBOARD <br />FLOW DEPTH <br />MINIMUM <br />DITCH <br />DEPTH REQUIREMENTS <br />"V" DITCH DETAILS <br />DRAINAGE <br />AREA F <br />DRAINAGE AREA F <br />SEE MAP No. 21 -3 FOR LOCATIONS <br />DITCH DITCH <br />No. DEPTH <br />FLOW <br />DEPTH <br />DITCHES: Fl, F2, F3, F5,F6,F8,F10,F12,F13,F17,F18,W. DIV. #2 <br />D -F1 0.6 <br />0.3* <br />D -F2 0.6 <br />0.3* <br />D -F3 0.5 <br />0.2* <br />D -F4 1.2 <br />0.2 <br />D -F5 0.7 <br />0.4* <br />D -F6 0.7 <br />0.4* <br />D -F7 1.7 <br />0.7* <br />NOTES: <br />D -F8 0.7 <br />0.4* <br />D -F9 1.1 <br />0.1 <br />1. Riprap shall consist of hard, dense, rough <br />D -F10 0.7 <br />0.4* <br />fractured stone as nearly cubical as <br />D -F11 1.2 <br />D -F12 0.7 <br />0.2 * <br />0.4 <br />practical. Stone shall be well graded in <br />p g <br />D -F13 1.3 <br />1.0 <br />order that the voids can be filled, and at <br />D -F14 1.2 <br />0.2 <br />least 50 percent of the mass shall be <br />D -F15 0.4 <br />0.1 <br />stones equal to or larger than the specified <br />D -F16 1.2 <br />0.2 <br />D -F17 0.7 <br />0.4* <br />riprap size. <br />D -F18 0.8 <br />0.5* <br />UpDivWestl 1.4 <br />0.4 <br />2. A geotextile fabric shall be placed under <br />UpDivwest2 1.3 <br />0.3 <br />all riprap. Use Mirafi 60OX or equal. <br />UpDivEast 1.4 <br />0.4 <br />'SIDESLOPE <br />3. See Figure 4 for additional spillway details. <br />* SIDESLOPE DETAIL SHOWN <br />IN DITCH <br />DETAIL' TABLE <br />