My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56906
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:21 PM
Creation date
11/20/2007 5:14:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998067
IBM Index Class Name
Permit File
Doc Date
7/22/1998
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6.3 Wildlife. <br />(1) Safety and protection of wildlife with special attention to critical periods in the life cycle of <br />those species which require special consideration. <br />No special safety or protection methods aze proposed in the D.O.W. report. Neither does the D.O.W. <br />report for the species listed suggest critical periods in their life cycles that will be affected by this <br />operation. <br />The surrounding rangeland would indicate that there is no shortage of this type of habitat in the area. <br />(2) Habitat management is not proposed as part of the rangeland reclamation plan submitted for this <br />operation. <br />6.5 Topsoiling. <br />(1) Topsoil will be segregated and stockpiled for use in reclamation. If these stockpiles remain for <br />over 1 growing season, they will be seeded with 6#/A wheatgrass to preserve the integrity of the <br />topsoil. No acid or toxic material will be involved with this operation. <br />(2) Any woody vegetation on the affected area will be put to use, as per the BLM, i.e. Slash/Mulch. <br />(3) Topsoil will be stockpiled on the pit perimeters and will be of a low configuration to prevent <br />erosion. These stockpiles will not be disturbed by the ongoing mining operation. <br />(4) Topsoil will not be rehandled until it is replaced on the re-graded areas in the reclamation phase. <br />(5) The soils in the affected are primarily: <br />Rizozo-Neville Complex <br />Rizozo Rock Outcrop Complex <br />Ustic-Torriorthents - Sedillo Complex <br />There are no other more suitable materials on site for sustaining vegetation. <br />(6) Growing media (topsoil) will be replaced in an even a manner as possible at an avereage depth <br />of 0" - 4" when available -see NRCS report cited earlier. <br />(7) There will be no vegetative piles to be removed or utilized in reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.