Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rulc 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />-~ <br />None <br />Second Quader200 <br />06/10/04 <br />General Description or Reference to Site Pl(a~n: I <br />/Je~-5{-!/91f ~~~ (o tl' C'C'i U-C~ICjU/f -` ~Oi.~ <br />J~v"l frl S~C/'/(C:L Czt' c.Lr f S ~L-/~'~~ r <br />EMBANKMENT <br />~„~„n ~re~ v~n-Nl C~trc~evtPr^~ rcl~C/ /S <br />,J <br />1). Adequacy of thevegelativearver. Excellent Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some Pew Nane <br />3). Is wave action causing erosion: <br />On the Upstream emhankrnenl? Yes No <br />4). Erosion of the downstream toe of the embankment? Yes No <br />Cause of erosion can he attrihuted to: <br />5). Is seepage occurring through the dam? Yes No <br />Could This seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />Explain: <br />OTNER OBSERVATIONS: <br />MSHA Qualified Impoundment Inspector <br />~~-/oy <br />Date <br />Page 1 of 2 <br />