Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTIOIJ REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk WJ7 ~[ <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter 2004 <br />Inspection Date: 06/10/04 <br />General Description or Reference to Site Plan: <br />~trS ewr C w r~ ~17P~(J' ~Scc.s/a,/ // e~s//~e/«S~ ~J(D ~/c-'~S~/~/~ <br />j~re~ra~..s-~--- u.r,.dJ r'ect~rcws lcu~i•7U Trrn~Zr~c:, ~~r~.r~~~raL~se rih~ee._ <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosimr <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />U/ <br />b <br />5). Is seepage occurring through the dam? Yes _ o __ <br />Could this seepage cause potential instability? <br />Excellen ~ ocle'ale f=ew Poor <br />F_xlensivr, Some ~ Nnnr. <br />SEDIMENT STORAGE CAPACITY <br />1j. Has the design storage capacity of the reservoir been surpassed? <br />,. Yes <br />Explain: der, J~<-~ <br />OTHER O$SERVATIONS: <br />~~~,~ <br />MSHA Qualified Impoundment Ir Spector <br />~,~~ /~~~ <br />Date <br />Page 1 of 2 <br />PJ o L~~ <br />0 <br />