Laserfiche WebLink
CIRCES Cost Estimatinn Software <br />PROJECT IDENTIFICATION <br />Task # : 202 <br />Date : 09/16/1005 <br />User: JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Minor Revision 61 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />Permitrob#:C-1996-083 <br />Abbreviation :none <br />Filename : C083-202 <br />to Drill Pad <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.01 NA <br /> Operating cosUhour : 593.55 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $31.78 NA <br /> Total unit cosUhour : $178.34 Total fleet costfiour : $176.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 370 BCY factor : 1.250 volume : 462 LCY <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency descdption : Job efficiency : 0.83 (1shiR/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rQ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 0.95 (Cat HB) <br />Average site altitude : 7,900 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight 2 550 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Earth - Drv Hacked <br />Adjusted unit production <br />Adjusted fleet production <br />479.16 LCY/hr <br />479.18 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0.97 Hours <br />Unit cost : $0.368 lLCY Total job cost : $170 <br />Horsepower: 405 <br />