My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56888
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:20 PM
Creation date
11/20/2007 5:13:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
8/25/2005
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR61
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Date: 16-Sep-2005 Permitorjob no.: C-1996-083 <br />User : JRS Abbreviation : none <br /> Filename : C083-000 <br />Agency or organization name :Colorado Division Of Minerals And Geol <br />Permit or job action :Minor Revision 61 <br />Site :Bowie No. 2 Mine <br />State :Colorado <br />County :Delta <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />201 -Regrade Drill Pad dozer 1 2.4 $430 <br />202 -Replace Topsoil from Stockpile to Drill Pad dozer 1 0.9 $170 <br />203 -Reseed Drill Pad ravage 1 0.2 $399 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suaTOTALS: 3.8 $999 <br />' inUudes inflatlon factor atljustment of : NA °/a TOTAL DIRECT COST' $999 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability InSUfanCe : 2.02 % Of d%rect total = $20 <br />Performance bond : 1.05 % o/direct total = $10 <br />Job superintendent : 1.82 hrs'...Y/hr: $37.50 total = $68 <br />Profit : 10.00 % of direct total = $99 <br />'assume net hours = 50% o/task hours TOTAL O & P = $199 <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - CONTRACT AMOUNT (tlirect+ O 8 P) _ $1,198 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or wntracUbid preparation : 4.25 % of cntr. NA total = $51 <br />Reclamation management and/or administration : 3.25 % of cntr. NA total = $39 <br />CONTINGENCY- NA' NA total = NA <br />'crontingencies accounted /or at task lave/ TOTAL INDIRECT COS7= $289 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $1,288 <br />
The URL can be used to link to this page
Your browser does not support the video tag.