Laserfiche WebLink
S~ - 2.05.3 <br />percent and 30 percent, respectively, both to control drainage and to catch and retain <br />• loose rock from above. <br />Road construction methods am similar for all classes of roads, with constnuction generally involving <br />initial Bearing of vegetation and recovery of available soil materials, cut-fill excavation and placement, <br />• <br />U_J <br />PR04 2.05-31a Revised May 2001 <br />