My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25019
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:53 PM
Creation date
11/20/2007 5:13:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Hydrology
Doc Date
10/27/2005
Doc Name
3rd Quarter 2005 Inspection Report
From
J.E. Stover & Associates Inc
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY SAE INSPECTION REPORT <br />Identification <br />During Inspection: <br />Imate Water Level <br />nt (% total storage) <br />(cfs) <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Omer <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Comments <br />Required: <br />Permit Reference <br />oflnspector: Jim Stover <br />Central A alachia Mining, LLC Quarter: <br />Mun er Can on Mine C•81-020 inspection <br />SAE 1 SAE 2 SAE 3 SAE 5 Sediment Pond <br />Mine Loma Dirt Fan Refuse Pile <br />Dam D D D Dam <br />0% 0% 0% 0% 0% l <br />0 0 0 0 0 <br />No No No No No <br />No No No No No <br />No No No No _ No <br />No No No No No <br /> <br />No No No No No <br />No No No No No <br />No No No No No <br />No T No T No ~ No ~ No <br />SAE-4 -Topsoil is no longer required. See Volume V, Appendix M(viii}4 <br />Vegetation is adequate to conVOl erosion. , <br />The refuse pile sediment pond had been cleaned out after it was flooded by <br />the Juiy 25 rainfall event. All of the water and mud have been removed. <br />The primary spillway pipe was found and cleared. The emergency spillway <br />has been reshaped. TR-19 is in process to allow the emerge®cY~ Iway to <br />change from open channel to a 21" diameter culvert. feo0 R f g fslF + <br />e9o•S <br />IQ s°0 F ••e ~ • <br />Volume V, Appendix M (viii), & Volume II Figure 2. ~~~~ ~S Tp~,Fp ~ <br />O• T• <br />~ U ii'Qg y~~n ~' iy}~_r t <br />P. E. <br />°°°~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.