Laserfiche WebLink
<br /> <br />EXHIBIT B - f11PJING PLAN <br />At the time of this application there is a stock pile of <br />gravel on the north end of the affected area. This pit has been <br />used on construction project and has had no reclamation done. <br />faintenance is planning on using just half of the pit as it <br />is a multiple user pit. The Maintenance has written permission <br />from the property owner to divide the pit and fence the east half <br />for their use. 1aintenance will use a bulldozer, front end loader, <br />iaotor grader, screening plant;~~and possible hot plant in their <br />portion of the pit. <br />Upon completion of the gravel extraction the iaintenance <br />• <br />Department ~•~ill proceed with the reclamation of the pit as per <br />reclamation plan submitted. (Exhibit E) <br />The quantity of material used will be dependent upon mainte- <br />Hance needs; less than 70,000 tons of material will be mined per <br />calendar year. The affected area may be used for less than 180 <br />days per year. <br />Ij <br /> <br />