Laserfiche WebLink
• <br /> <br />EXHIBIT E - RECLAPIATION PLAN <br />The anticipated post-mining land use will be grassland. <br />At the completion of mining all slopes will be graded to no steeper <br />tharf~l and contoured to reflect the natural terrain of the area. <br />Final grading will be approved by the materials engineer prior to <br />topsoiling of the area. Topsoil will be replaced in an even manner <br />over the mined area to a minimum o~ 6". The followin9rfertilizatidn, <br />seeding, and mulchin§ specifications are to be used for reclamation <br />of the affected area. <br />Reclamation will occur subsequent to the completion of mining <br />operations for the projects. Less than 10 days will be required <br />• for grading, topsoiling, and fertilization, seeding and mulching <br />of disturbed areas. The haul road is a permanent access road <br />and will not be reclaimed. <br />• <br />