My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56838
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:18 PM
Creation date
11/20/2007 5:12:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
3/17/2005
Doc Name
Compacted Clay Liner & CDOT
From
DMG
To
SW TKO Joint Venture LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lined Pit Guide 10 September 2000 <br />first excavating a trench with a flat floor and sloping sides around the perimeter of the reservoir at the <br />midpoint of the wedge of soil liner fill that will be installed. Trench excavation continues until <br />impermeable material is penetrated to the depth listed in the specifications. The keyway is backfilled <br />with soil liner fill that is compacted in accordance with the specifications. _ _ <br />Soi[ Liner Cover Fil! <br />The design should describe the materials that will be used to bury the soil liner and the depth of burial <br />xo prevent desiccation,-freeze-thaweffects,-and erosion. -Typicallylhe-wedge-ofsoil-lixier-fill-may by <br />covered by several feet of random fill, and the xeservoir perimeter protected from wave erosion by a <br />layer of pit run gravel or riprap depending on the size of the water surface and the anticipated wave <br />generation. <br />Specifications <br />The Division of Minerals and Geology does not require that Applicants provide the complete set of <br />technical specifications for a soil liner project. However, certain elements of the specifications should <br />be incorporated into the reclamation-permit to become eligible for the lower bond under the regulated <br />construction option. These elements aze outlined in the following list of typical examples: <br />Submittals - Provide a basic earthwork operations plan and schedule for the installation of the soil <br />liner and the soil liner cover fill. Include a description of the equipment and quality control <br />procedures to be used, including lift thickness control, composite material prepazation, and methods <br />for moisture conditioning. <br />Materials -Soil liner and soil liner cover fill shall be free of organic matter, debris, frozen material, <br />and other deleterious materials. Soil liner fill shall be excavated from approved borrow areas and <br />conform to the following (example) specification: <br />U.S. Standard Percent Passing <br />Sieve Size by Dry Weight <br />3/4-inch ~ 100 <br />3/8-inch 70-100 <br />No. 4 SO-100 <br />No. 40 20-50 <br />No. 200 20-SO <br />Plasticity Index I O minimum <br />Excavations -Excavations shall be graded and properly maintained to provide adequate drainage at <br />all times. Work shall be suspended when the site is overly wet, muddy, or otherwise unsuitable for <br />proper maintenance. In excavations where soil liner fill is to be placed on slopes steeper than <br />
The URL can be used to link to this page
Your browser does not support the video tag.