My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24994
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:52 PM
Creation date
11/20/2007 5:12:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
12/7/2004
Doc Name
Requested Information Regarding NonCompliance CO-0044776
From
Bowie Resources, LLC
To
WQCD
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. I hereby certify that the accelerated Whole Effluent Toxicit~ testing is being <br />conducted for Outfall 002W, acute P. promelas, for the 2" quarter WET test <br />failure. Bowie's routine WET test performed in August, which passed, is <br />considered to be the first accelerated test. Bowie performed a second additional <br />accelerated test the week of October 18, 2004 and it failed. A third WET test was <br />performed the week of November 15, 2004 and it passed. Bowie now has two <br />tests that passed (August and November 15`h) and one failure (October 18th) on <br />its accelerated testing. A fourth test will be performed the week of November <br />29th. If the November 29`" test passes, the toxicity episode will be considered to <br />be ended. <br />4. One of the problems with maintaining compliance with total suspended solids is <br />the volume of mine water,that is treated in the sediment ponds_ The volume of <br />mine water requires the pond be discharged before adequate settling has <br />occurred. Bowie intends to change its method of handling mine water. In the <br />near future, mine water will be treated (settled) in large underground sumps. <br />The mine water will then be discharged directly to the surface at permitted outtall <br />006. We expect to have this new mine water handling system in place during <br />February 2005. In addition building two new equipment washdown bays with oil <br />collection systems to reduce problems with oil and grease. Our other oil <br />collection sumps were cleaned. We will be more diligent in this effort. <br />5. We performed a compliance audit on the DMR's and did detect some minor <br />mistakes in reporting on the DMR's. At your request we will submit corrected <br />DMR's. <br />We are available to meet with you to discuss these issues at your convenience. <br />Sincerely; _ _ _ _ <br />lt~~'~ /~ (/1 <br />Wm. Bear Jr <br />
The URL can be used to link to this page
Your browser does not support the video tag.