My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24989
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:52 PM
Creation date
11/20/2007 5:11:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
1/30/1997
Doc Name
SENECA COAL CO SENECA II W MINE PN C-82-057 T3 STOCKTANK AS BUILT REPORT
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />SENECA COAL COMPANY <br />SENECA II-W MINE, PERMIT C-82-057 <br />T-3 STOCRTANR AS-BUILT REPORT <br />The T-3 stocktank was constructed in the fall of 1996. It is <br />located at the outlet of HRD-A5, in the NWy,SE~ of Section 22, <br />Township 5 North, Range 88 West. The location of T-3 stocktank is <br />shown on Exhibit 13-2, Surface Hydrology Map. All of the stocktanks <br />at the Seneca II-W Mine will be constructed following the <br />guidelines contained in Attachment 13-11. An as-built survey of <br />this structure was conducted on October 6, 1996. This survey <br />generated the following statistics for stocktank T-3. <br />Bottom of Pond Elevation - 7402.2 <br />Spillway Elevation - 7406.9 <br />Average Spillway width - 16.0 feet <br />Top of Embankment Elevation - 7410.9 <br />Average Top of Embankment Width - 10.3 feet <br />Upstream Embankment Slope - 4.3H:1V <br />Downstream Embankment Slope - 2.9H:1V <br />Basin Elevation-Staae-Area-Capacity Table <br />ELEVATION STAGE AREA CAPACITY DESCRIPTION <br />(FT.-MSL) (FEET) (ACRES) (ACRE-FEET) <br />7402.2 0.00 0.00 0.00 BOTTOM OF POND <br />7404.0 1.80 0.03 0.02 <br />7406.0 3.80 0.06 0.11 <br />7406.9 4.70 0.08 0.17 SPILLWAY <br />7408.0 5.80 0.11 0.27 <br />7410.0 7.80 0.17 0.55 <br />7410.9 8.70 0.19 0.71 TOP OF EMBANKMENT <br />To the best of my knowledge and belief, based upon my professional <br />expertise, and to the extent possible, stocktank T-3 at the Seneca <br />II-W mine was constructed in accordance with prudent state-of-the- <br />art earthen embankment construction. Further, the structure was <br />constructed in compliance with the approved guidelines as specified <br />in Attachment 13-11 of Seneca Coal Company's approved mine permit. <br />Seneca will inspect the stocktank quarterly to evaluate structural <br />integrity, storage capacity conditions, and remedial work <br />requirements. Therefore, pursuant to Rule 4.05.6(10), the above is <br />the T-3 stocktank as-built certification report. <br />,;A~ 3 ~ ~g97 <br />Michael ~. J~Ytavill <br />Colorado P_E. 2~~55 <br />Date <br />l `'°} <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.