My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24955
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:51 PM
Creation date
11/20/2007 5:10:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Hydrology
Doc Date
5/4/2007
Doc Name
2007 Annual Impoundment Inspection
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Prof Pond Certifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM MINING, LLC <br />McLANE CANYON MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed. and rn accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impow~dment located at the McClane Canyon Mine. <br />On March 13. 2007, I performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety of experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential far failure. There was no appearance of erosion, instability, structural <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than monthly and yearly inspections. There are no aspects <br />which might affect stability and there is no required maintenance. The sediment pond <br />had water standing at the center line of the primary spillway at approximate elevation of <br />5457.25. <br />The required capacity of the sediment pond is 0.55 A-F. The required water capacity of <br />the sediment pond is 0.36 A-F and the required sediment capacity is 0.19 A-F (ref. PAP <br />Section 2.4.1 and Table 4.2-12). The actual size of the pond exceeds the required <br />capacities listed rn the permit. <br />The sediment pond has the following estimated capacity based on the existing water <br />level in the pond: <br />^~ . <br />POND CAPACITY -ACRE FEET <br />Water Sediment Total <br />(U.95 Max} (75°0 of 0.28) 0.85 <br />0.64 0.21 <br /> <br />To the best of my knowledge and belief, the +mpoundmentlsediment pond at the <br />McClane Canyon Mine has been maintarrlr3d as designed and in accordance with the <br />approved plan and applicable regulatio(~. .~' „~ <br />~, <br />James E. Stover ~': `r `1 °~ , ~rbate <br />Colorado Professroria~Enguieer ,+ <br />Registrapon No. 19230 : ~ ~ o:~" <br />
The URL can be used to link to this page
Your browser does not support the video tag.