Laserfiche WebLink
Paperwork Ilteduction Act Notice <br />Public reporting burden for this collection of information is estimated to vary from a range of 10 hours as an <br />average per response for some minor facilities, to 110 hours as an average per response for some major facilities, <br />with a weighted average for major and minor facilities of 18 hours per response, including lime for reviewing <br />instructions, searching existing data sources, gathering and maintaining the data Wended, and completing and ' <br />reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of <br />this collection of information, including suggestions for reducing this burden, to Chief, Information Policy <br />Branch, PM-223, U.S. Environmental Protection Agency, 40i M Street, SW Washington, DC 20460; and to the <br />Offrce of Information and Regulatory Affairs, Oflice of Management and Budget, Washington, DC 20503. ~ <br />General Instructions <br />1. If form has been partially completed by preprinting, disregard instructions directed at entry of that information <br />already preprinted. <br />2. Enter ~'Permittee .NnmeiAfar/ing ,9ddress (and facility name/location, if different)," "Permit ,number," and <br />"Discharge Number" where indicated. (A separate form is required for each discharge.) <br />3. Enter drtles beginning and ending "~L1oniloring Period" covered by form where indicated. <br />4. Enter tech "Parameter" as specified in monitoring requirements of permit <br />5. Enter "Sample ,1feasuremenr" data for each parameter under "Quantity" and "Quality" in units specified in permit. <br />".9verage" is normally anthmetic average (geometric average for bacterial parameters) of all sample meazurements <br />for each parameter obtained during ",lfamtoriug Pcrin~'; ".tlaximum" and ",tlmtmu,r," are norntall}' extreme high <br />and low measurements obtained during ".Llorrironng Period." (Note to municipals pith secondary tre~~tment <br />requirement: Enter ?U-day average ol'sarnplc measurements under "average," znd enter macimitm 7-riay average <br />of sample measurements obtainal during monitoring period under ",ldarin.um.') <br />6. Enter "Permit Requirement" far each parameter under "Quantity" and "Quality" az specified in permit. <br />7. Under "Nn Ex" enter number of sample measurmen[s during monitoring period that exceed maximum (and/or <br />minimum or 7-day average az appropriate) permit requi cment for each paameter. ff none, enter "0". <br />8. Enter "Frequencc ojAnalysis" both as ".Sample ,Lfea.^vrrnen!" (actual frequency of sampling and analysis used <br />during monitoring period) and az "Permit Rcquirrnunl" specified m permit. (c.g., Enter "Copt," for continuous <br />monitoring, "//7" for one day per week, "I/30" for one day per month, "1%90" for one day per quarter, etc.) <br />9. Enter ".Sample Type" both az ".Samp/e ,Lfeasuremenl" (actual sample t}pe used during monitoring period) and as <br />"Permit' Requirement," (e.g., Enter "Grab" far individual sample, "2dHC" for 24-hour composite, "P.7A" for <br />continuous monitoring, etc.) <br />10. Where violations o[ permit requirements are reported, attach a brief explanation to describe cause and corrective <br />actions taken, and reference each violation by date. <br />l 1. V "no discharge" occurs during monitoring peri ad, enter "No Discharge" across form in place of data entry. <br />1?. Enter "Narne/I'it/e ojPrincipa! Executive O~,:er" with "Signature ojPrincipa! Executive Officer ojAulhoriced <br />Agent,"',"Telephone Number," and "Date" a[ bottom oC (orm. <br />13. Mail signed Report to Office(s) by date(s) specified in permit. Retain copy for your records. <br />14. More d tailed instructions for use of this Discharge Monitoring Report (D~l1R) form may be obtained from Office(s) <br />specitie~ in permit. <br />Legal Notice <br />Ibis report is required by law (33 U.S.C. 1318; 40 C.F.R. 125.27). Failure to report or failure to report truthfully can <br />result in civil penalties not to exceed E10,000 per day of violation; or in criminal penalties not to exceed x25,000 per day <br />of violation, oq by imprisonment for not more than one year, or by both. <br />EPA Form 3320-1 (Rev. 08-95) <br />