Laserfiche WebLink
~i <br />GENERAL TERMS AND CONDITIONS: (IMPQRTANT! READ ITEMS 7 AND 8) `.,. •., <br />1, This permit is issued in reliance upon the accuracy and completeness of information <br />supplied by the applicant and is conditioned upon construction, installation and operation <br />in accordance with this information and w;th representations made by the applicant or its <br />agents. <br />2. This permit is valid.only for the equipment and operations specifically identified herein:'`' . <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any <br />cnal!enge ±o, or appeal of, a condition hereof snali constitute a refection of the entire permrt : , <br />.and upon such occurrence this permit shall be deemed denied ab rnitio. <br />4. This permit may be revoked at any time prior to final approval by the Air Pollution Control , <br />' Division {APCD) on grounds set forth in the Colorado Air Duality Control Act anal <br />regulations of the Air Quality Control Commission (AQCC), inc(udng failure to meet any . <br />express term or'condition of the permit. <br />5. This permit must be retained and made available for inspection upon request at the ,. , <br />location set forth herein. With respect to' a portable source which is moved to a new :': ' <br />location, a copy of the revised Air Pollutant Emissions Notice (APEN) (required by law to'.' <br />be submitted to the APCD whenever a portable source is relocated} should be attached to <br />this perm~t..The permit may be reissued to a new owner as provided in Section !II,B. of .. . , <br />AOCC Regulation No. 3 upon transfer of ownership. : <br />, .. <br />6.. initial approval of ar, emission permit does not provide "final" authority foreperation of this •. <br />• source. Final approval of the permit must be secured from the APCD in writing in ~- <br />accordance with the provisions of C.R.S. 1973, Section 25-7-114(4)(j) and Section.IV.H: of ... ' <br />AOCC Regulation No. 3. Final approval cannel be granted until construction iscompleted . ;" . <br />and operation and construction have been verified by the APCC as conforming in all . <br />respects with the conditions of the in~tiai approval permit. . <br />7. you MUST notify the APCD at least thirty days (frfteen days for portable sources) prior to ..:. <br />commencement of the permitted operation or activity..Faiiure to do so is a vio!atior, of ,, , <br />C.R.S. 1973, Section 25-7-1?4(a}(j) and Regulation No. 3., Section IV.N. i .,and can result in ~~ <br />the revocation of the.in~tial approval permitr <br />8. you MUST otitairi final approval ~withi~ six months o'the commencement ofoperation as <br />that term is defined by Lhe AOCG. Failure to obtain fin.ai approval evifl result in,the-: <br />revocation of the initial approval permit. ' <br />9. It the APCD determines that the terms and conditions of the initial approval permit have <br />been satisfied, the APCD will issue a !final approval permit, which goes constitute "final"- <br />author~ty to operate as discussed ~n Paragraph o above. <br />10. Violation of the terms of a 1lnal approval permit a of the provisions of the Galorado Air <br />Oua!ity Control Act or the regulations of the AOCC may result :n administrative, c+v!I or . <br />criminal enforcement actions under C.R.S. 1973, Sections 25-7-115 (enforcement), 25-7-. . <br />121 (injunctions), 25-7-122 (civil penalties) and 25-?-114 (criminal penalties). , <br />? 1. Unless specifically stated otherwise, the general and special conditions contained in <br />this permit have been determined by the APCD to be necessary to assure compliance <br />wrth the provisions of C.R.S, 1913, 7.5-7-114(4){g) and, as such, shall be enferceab!e ... <br />under the provisions of C.R.S. 1973, 25-7-115 after final approval of the permit has been ,:,: <br />granted. , <br />