Laserfiche WebLink
. The NOV abatement for CV-2004-005 was to 1) Dewater sediment pond, <br />2) Excavate failed embankment and recompact embankment, 3) Submit <br />P.E. certification of the reconstructed embankment in accordance with <br />4.05.4(14). <br />NOV abatement for CV-2005-004 was to 1) install culvert CMP-3 in <br />compliance with approved permit and 2) Submit complete minor revision <br />application addressing temporary rock storage area, access, and topsoil <br />salvage/protection. <br />(f) The applicant has restored "design capacity of Culverts "D", "E", and "H" <br />for CV-2005-008 and paid a fine of $800. <br />The applicant dewatered the sediment pond, reconstructed the pond <br />embankment and submitted a P.E. certification of work performed in <br />accordance with 4.0.5.4(14) for CV-2004-005 and paid a fine of $400. <br />The applicant installed culvert CMP-3 and submitted a complete minor <br />revision (MR-22) addressing temporary rock storage area, access and <br />topsoil salvage/protection for CV-2005-004 and paid a fine of $500. <br />~' <br />1 M <br />-2- <br />03/06 <br />