Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk /ep/¢ -,~j~ ~~ <br />NPDES ID. No.: None <br />Inspection Period: Firsl Quarter 2003 <br />Inspection Date: 3/7/03 <br />General Description or Reference to Site Plan: O~'~ ~ <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />Excellent Moderate Few ~ 00 <br />Extensive Some ew None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />~° <br /> <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />~%L-- <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br /> <br />~~4~CC~«~s~/a/Lw ~ ~ <br />~~~~ ~~~ <br />MSHA Qualified Impoundment Inspector <br />3/73 <br />Date <br />