My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56697
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:12 PM
Creation date
11/20/2007 5:09:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tab 18 Hydrologic Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the native species found in the stream buffer disturbance areas along Dry Creek, as <br />well as other desirable species, will be used for revegetation. <br />Water Rights <br />The surface and ground eater rights adjacent to the Seneca II-W mining area ere listed in <br />Table 16-1 and shown on Exhibit 16-1 of Tab 16. The water rights inventory boundary <br />includes all water rights within a three mile radius of the Seneca II-W Mine. Attachment <br />16-A of Tab 16 (Protection of the Hydrologic Balance) provides further description of the <br />ground and surface water rights and plan for augmentation. <br />Alternative Water Supplies <br />Attachment 16-A of Tab 16 (Water Rights Investigation and Plan for Augmentation) lists the <br />eater rights and sources Peabody has available to utilize as alternate water supplies via <br />legal agreements to mitigate pit inflow drawdoun and sediment pond storage, industrial <br />eater use, and mining disturbance impacts to surface Water right holders. The principal <br />alternative eater supplies are the Temple Reservoir No. 1/Emrich Reservoir (36.1 acre <br />feet), and Stagecoach Reservoir (50 acre feet), 006 pond, 005 pond, and Production Welt <br />No. 1. No mitigation of any ground water impacts other than Temple WetL No. 1 are <br />anticipated. All of the above water sources are considered as alternative water supplies <br />that can be used as part of Peabody's augmentation plan for mitigating potential surface <br />water rights impacts or for mitigating separate eater rights agreements (Appendix 16.1) <br />Peabody has entered into. <br />Protection and Mitigation Plan <br />The Probable Hydrologic Consequences analysis (Tab 17) did not conclude that there will be <br />any adverse hydrologic consequences from the Seneca II-W mining. Any preexisting ponds <br />and cells that will be removed by mining have been mitigated via IegaL agreements <br />(Appendix 16-1). A detailed augmentation and eater rights plan is presented in Attachment <br />Lb-1 of Tab 16 and any potential impacts associated with pit pumpage and industrial eater <br />use at the mine will be fully mitigated by this plan. <br />• In addition to the mining practices designed to minimize disturbances [o the hydrologic <br />balance previously discussed, comprehensive ground and surface eater monitoring plans have <br />5 Revised 12/28/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.