Laserfiche WebLink
1 <br /> MINING TIMETABLE <br /> ' The following timetable is based on the best projected estimate of future <br /> ' demand. Any economic change from the norm can, and will, radically change <br /> all of the timetable estimates. <br /> ' STAGE <br /> ' STAGE YEARS TOTAL ACRES EST YD CLAY <br /> 1 1-2 1.64 7300 <br /> ' 2 1-2 1.91 7700 <br /> 3 1-2 1.52 8000 <br /> ' 4b 1-2 2.01 8400 <br /> 39 <br /> ' 5 1-2 1.53 8800 <br /> 6 1-2 1.84 9300 <br /> ' 7 1-2 1.45 9800 <br /> 8 1-2 1.77 10300 <br /> 9 1-2 1 .73 10800 <br /> Stockpile --- 1.60 ---- <br /> TOTALS 9-18 17.39 80,400 <br /> 1 , <br /> 1 <br /> 11 <br />