My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M1980245
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1980245
>
_PERMIT FILE - M1980245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 1:30:32 PM
Creation date
11/20/2007 5:09:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980245
IBM Index Class Name
Permit File
Doc Name
Exhibit D Mine Plan
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This pit will be operated on a demand basis. Normally, the mining and <br /> stockpiling of this clay will take two to three months , once per year. When <br /> ' this type of clay is required by the brick plant, it will be removed by truck <br /> from the mine stockpile. <br /> As operations begin on each stage, some of the overburden will be used <br /> to backfill the open stopes, and the remainder will be removed and used to <br /> backfill the previously mined area, Topsoil in the areas to be mined is <br /> ' virtually non-existant due to the steep, rocky slopes; therefore, no topsoil <br /> stockpiles will be made. <br /> ' The overburden will be removed using a bulldozer and ripper. At this <br /> time it is not known if the overburden has to be drilled and blasted. If <br /> ' the overburden is too hard an air-trac and explosives will be used to fracture <br /> the ground and the dozer will then remove the overburden. <br /> After the overburden is removed, the clay will be mined with a bull- <br /> dozer. In areas where the vein is too narrow for a bulldozer to safely <br /> operate, the top half of the clay will be blasted down; providing the larger <br /> tmaneuvering platform needed. The clay will then be stockpiled in the area <br /> t that the overburden was removed. The clay is then loaded with front end <br /> loaders and hauled with trucks to the plants. <br /> There are approximately 3.2 acres of existing access roads . Additional <br /> access to the mining areas will be within the affected lands. Very minor <br /> amounts of water may be used to control dust under the most adverse traffic <br /> or wind conditions. In general , water on a clay surface creates a very slick <br /> 1 condition, making it difficult to work; thereby, watering will only occur when <br /> ' absolutely necessary to control fugitive dust. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.