Laserfiche WebLink
iii iiiiiiiiiiiu iii , • <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIV:uION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver. CO 80203 <br />303 866-3567 <br />FA%:303 832-Bt06 <br />pF Cpr <br />~.Q'~~A <br />tiT/ G <br />`~1/~ <br />I• ~ /` <br />'A'!6 <br />Rey Romer, <br />GDVemor <br />March 17 , 1992 Michael B. Long, <br />D viswn Dvector <br />-Mr. -Ro-lad-G-Bber~n ~~ ~~•i,~ ,G.~~`y~;- <br />Obe~i~lg-Wert-&-Associates-. 7.~~~~ 7•>0~.~ -~ <br />-I0~5 El-kton Drive-• Vic- ~~,~ ~x.~ <br />Colorado Springs, CO 809D7.-_ ~ ~,;~ .a~-,;~ w ~~~7 ~i~~~'7 <br />Re: M-91-0B2, Tiger Timber Site, Permit Issuance <br />Dear Rolad G Obering: <br />On March 17, 1992, the Mined Land Reclamation Division found Tiger Timber Inc. <br />to have satisfied the applicable requirements of C.R.S. 34-32-101 et sec. for <br />obtaining a mining and reclamation permit. Therefore, a permit is being <br />issued. Two signed originate of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, March 17, you must 5ub~nit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$175.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please ccntact me. <br />Sincerel , <br />MICHAEL B. ONG <br />Division Director <br />MBL/ern <br />Enclosure(s) 65?OG <br />