Laserfiche WebLink
TABLE OF CONTENTS -continued <br />• <br /> 780.12 Operation Plan: Existing Structures 2 780-30-I <br /> 780.13 Operation Plan: Blasting 2 780-44 <br /> 780.14 Operation Plan: Maps R Plans 2 780-55 <br /> 780.15 Air Pollution Control Plan 2 780-60-I <br /> 780.16 Fish & Wildlife Plan 2 780-83-I <br /> 780.18 Reclamation Plan: General Requirements 2 780-104 <br /> 780.21 Reclamation Plan: Protection of Hydrologic Balance 2 780-144 <br /> 780.23 Reclamation Plan: Postmining Land Use 2 780-201 <br /> 780.25 Reclamation Plan: Ponds, Impoundments. Banks. Dams, 8• Embankments 2 780-207-I <br /> 780.27 Reclamation Plan: Surface Mining Near Underground Mining 2 780-218 <br /> 780.29 Diversions 2 780-219 <br /> 780.31 Protection of Public Parks & Historic Places 2 780-220-I <br /> 780.33 Relocation or Use of Public Roads 2 780-221 <br /> 780.35 Disposal of Excess Spoil 2 780-221-I <br /> 780.37 Transponation of Facilities 2 780-228 <br />• PART 785 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINI NG <br /> 785.15 Steel Slope Mining 2 785-I <br /> 785.17 Prime Farmlands 2 785-2 <br /> 785.18 Variances for Delay in Contemporaneous Reclamation Requirement in <br /> Combined Surface R Underground Mining Operations 2 785-2 <br /> 785.19 Surface & Coal Mining & Reclamation Operations on Areas or Adjacent to <br /> Areas Including Alluvial Valley Floor in Arid or Semi-arid Areas West of <br /> the IOOth Meridian 2 785-6 <br /> 785.20 Auguring 2 785-25-I <br /> PART 805 AMOUNT R DURATION OF PERFORMANCE BOND <br /> Scope of the Section 2 805-I <br /> PART 806 FORM, CONDITIONS, 8 TERMS OF PERFORMANCE BONDS & <br /> LIABILITY INSURANCE <br /> Scope of the Section 2 806-I-I <br /> PART 810 PERMANENT PROGRAM PERFORMANCE STANDARDS -GENERAL PROVISIONS <br /> Scope of the Section 2 810-I <br />• 810.2 Objective 2 810-I <br />MR 96-85 iii Revised 9/12/96 <br />