Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />RECEIVED <br />ENECA <br />Coal Company APR } ~ tigg~ Seneca Coal Company <br />Division of Minerals zs< neology <br />April 7, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RS: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Ms. Crosby: <br />Enclosed are copies of the first quarter Stockpond inspections <br />for those structures at Seneca II-W which have been constructed <br />to date. Inspections for Stockponds T-1, T-2, T-3, T-7, T-22 and <br />T-24 are included. All conditions appeared stable and <br />acceptable. The "as-built" certifications for these structures <br />were mailed to you in February. <br />Should you have any questions, please do not hesitate to call. <br />S <br />Mic 1 G. Alta)v4~ la, P.E. <br />Engi ~`_sing M- ~ ~ r <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />~ ~1. APR 0 7 1997 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />