Laserfiche WebLink
<br />Battle Mountain Resourceslnc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2007 Monthly Report <br />Page 3 <br />Table 2 -February 2007 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 2/28/07 D 41.71 0.00 <br />Pl3 2/28/07 40.97 41.34 0.37 <br />P14 2/28/07 D 41.24 0.00 <br />P15 2/28/07 41.10 0.00 <br />Table 3 below provides the calendar year 2007 sludge management for the San Luis site. <br />Table 3 -Water Treatment Plant Sludge Management Yeaz to Date. <br />Date Quantity Sludge Management <br />October 2006 Sludge transferred from Pond #3 to drying <br />ad. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719} <br />379-0798 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />iTulio F. Madrid ' <br />Environmental Coordinator III <br />Cc: Biil Lyie <br />File <br />