My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24921
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:50 PM
Creation date
11/20/2007 5:08:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
3/12/2007
Doc Name
February 2007 Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~~ ~ <br />BATTLE MOUNTAIN RESOURCES, INC.9'r" <br />March 08, 2007 <br />Mr. Allen Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 / <br />Febnlary 2007 Monthly Report ,/ <br />~•'~:~A9,/I~~ <br />R ~ 22t10I <br />_p Division of Rociamatron <br />`'~D hiinin9 and Safely ' <br />Dear Mr. Sorensen: <br />The following summarizes monitoring and site activities at the Battle Mountain Resources tnc. <br />(BMRf1, San Luis Project for the month of February 2007. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the Tit-32 Quality Assurance and Quality Control <br />(QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on February 27'", no water was present for <br />sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit monitoring wells on February 28m. February tailing impoundment piezometer <br />measurements identified these installations were either dry or contained less than 12 inches of <br />water as illustrated in Table 2. Tables 1 and 2 below identify the depth to water measurements <br />collected for each of the site monitoring wells, piezometers and lysimeters as required by the <br />terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on <br />February 27`". The Febnlary tailings pond underdrain flow average was 36.63 gpm and a total of <br />710 gallons of water was excavated from the leak detection system yielding a monthly average of <br />24.48 gpad. <br />During February the West Pit water treatment plant operated efficiently discharging a total of <br />6,318,800 gallons (19.39 acre-feet) of water to Rito Seco Creek and a total of 338,500 gallons <br />(1.04 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. <br />~~ <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.