Laserfiche WebLink
r <br />I <br />it <br />I <br />1 <br />L' <br />I� <br />i. <br />1 <br />I' <br />i <br />I <br />A1( <br />�1 <br />J�f <br />I � <br />( <br />1 <br />1. <br />i P <br />30 0 3 °U <br />LBp°aMseiLA <br />SV <br />0 <br />01 3 '"1 /,Cl <br />.d i �' U k' <br />I- <br />u e r <br />ai <br />Scale 1" = 30' to <br />Contour Interval = 2.0' W <br />N <br />T-- <br />Bison <br />Street <br />60.0' <br />Permit # Confidential? <br />ass Type Seq <br />V# Ins ect on D, t <br />)c Date (if no date stamp) <br />)c Name ,( its 4-1 L <br />am DRMS ther <br />DRMS /Other <br />!cipients,�' <br />Cro wn P.a. tlu 7411 <br />Point ca� pt,. 0 y_,a -J7,e <br />Warn -soon c+baa air <br />Land 7Je- fr&O-31"d ",* ° <br />Services <br />Bottom - 96=W <br />RECEIVED <br />(JUN 13 2001' <br />Division of Redamatidon, <br />Mining and Safety 1 <br />C� <br />�I <br />4' <br />qmq <br />3� <br />Roadway <br />rA <br />Roadway Detail <br />Not To Scale <br />Roadway shall have a 10% Grade maximum <br />do <br />J <br />7/ P <br />The rnuin mining <br />will <br />t u ,.0 the Northern purtiou ut the site. The roodwoy <br />will he <br />constructed in a <br />downwurd manner at a moxiurn grade of 10 %. to the pit <br />floor as <br />Indicated. When <br />the <br />mining is under process, the Retention pond area will <br />be <br />changing in size <br />and <br />location. The pit floor will become the bottom of the <br />Retention <br />pond. The water <br />of <br />the Retention pond would be evaporated and naturally <br />rcicased <br />Into the ground <br />below <br />surface. The Berm with security fencing placed on <br />top, will take; <br />care of any and <br />all <br />ottsile drainage from entering the site during the operation of the mine. <br />The offsite drainage <br />would be directed around the site to the North, West <br />and South. <br />When the pit has been mined out; the Tailings Slockpilc will be placed <br />Into the pit <br />arwo. <br />This would then become a portion of <br />the Reclamation Pion. The final <br />slope of all <br />pit wolls <br />at the conclusion of the reclamation <br />would not exceed 6:1 slopes, with <br />a relatively <br />level <br />surface with a Westerly 1% slope for <br />natural drainage. The Pond areas <br />along with <br />the> <br />entire Process area would be leveled <br />as part of the Reclomation. <br />Pit Wall Detail "C" <br />North. East and West nolb <br />Not To Scale <br />Bottom of Pond <br />a Variable Width <br />dli <br />Used rroac,s Pond Dotod "D" <br />Not To Scale <br />l% of 5' <br />rl <br />.f .,r t <br />I1 1- `rR1111115 -1 ,a � - r rii'R'1114 91 111-i Ti I 1111ir'i I IfF <br />