N7A=
<br />» msm
<br />N )KW
<br />.1.
<br />N )MYO
<br />N ,.�
<br />E. 100TH AVE.
<br />MCKAY ROAD
<br />RIGHT -OF -MAY
<br />EAST- --T04TRr - -ITV N E
<br />EY RESERVOIR SPECIAL SETBACK AND OTHER RESTRICTION
<br />1. UD &FCD APPROVAL REQUIRED FOR EXCAVATION WITHIN 400 FT. OF FUTURE
<br />WEST RIGHT -OF -WAY LIMITS OF S, PLATTE RIVER CHANNEL. NO EXCAVATION
<br />ALLOWED WITHIN 100 FT. OF FUTURE CHANNEL. A COPY OF UD &FCD APPROVAL
<br />TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION WITHIN 400 FT. OF FUTURE
<br />CHANNEL.
<br />2. SINCLAIR PIPELINE APPROVAL REQUIRED FOR EXCAVATION WITHIN 200' OF
<br />PIPELINE, UNLESS DMG ACCEPTS A REVISED STABILITY ANALYSIS PROPOSING
<br />LESSER EXCAVATION SETBACKS ALONG WITH APPROPRIATE MONITORING DEVICES,
<br />NO EXCAVATION ALLOWED WITHIN 35 FT, OF PIPELINE. A COPY OF ANY
<br />APPROVAL FROM SINCLAIR TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION
<br />WITHIN 200 FT. OF PIPELINE.
<br />3. PSCO APPROVAL REQUIRED FOR PERMANENT INSTALLATION OF SLURRY WALL,
<br />EXCAVATION WITHIN 200 FT. OF PSCO TOWERS, AND EXCAVATION WITHIN 35
<br />FT. OF PSCO RIGHT -OF -WAY. A COPY OF APPROVAL FROM PSCO TO BE
<br />SUBMITTED TO DMG, PRIOR TO SLURRY WALL INSTALLATION AND /OR
<br />EXCAVATION WITHIN 200 FT. OF PSCO. TOWERS OR 35 FT. OF
<br />RIGHT -OF -WAY,
<br />4. PRIOR TO CONSTRUCTION OF THE SLURRY WALL, PLANS, SPECIFICATIONS,
<br />AND A QUALITY ASSURANCE PLAN FOR THE SLURRY WALL CONSTRUCTION MUST
<br />SUBMITTED TO THE DMG FOR REVIEW AND APPROVAL. IN ADDITION, AT THE
<br />CONCLUSION OF CONSTRUCTION, THE OPERATOR MUST ALSO PROVIDE A
<br />CONSTRUCTION REPORT WITH A CERTIFICATION THAT THE SLURRY WALL WAS
<br />CONSTRUCTED IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS
<br />06/2/99 REVISED MINING AREA, ADDED STORAGE AREAS PER RNF
<br />8
<br />FULTON WILDLIFE'MINING /CONSTRUCTION PH
<br />1. BACKFILL SLOPES
<br />C4r
<br />PHASE IA - NONE, MINING TO 1' BELOW WATER TABLE ONLY
<br />PHASE 1B TO ABOVE GROUND WATER ELEVATION OF 5045± FT, WITH
<br />SEDIMENTATION FROM PLANT- 4,709± L. F. X 1125± xSQ. FT. / 27 =
<br />196, 210± C, Y.
<br />* - 25 FT, DEPTH X 90 FT, WIDTH / 2 = 1,125 SQ, FT.
<br />PHASE 1B TO FROM ABOVE GROUND WATER ELEVATION LINE OF 5045± FT. TO
<br />5,045 FT. OR 5 FT, ABOVE GROUND WATER ELEVATION LINE AT A 3 TO 1
<br />SLOPE (15 FT.) - 4,709± L. F. X 37.5 *SQ. FT, / 27 = 6,550± C. Y.
<br />x - 5 FT. DEPTH X 15 FT. WIDTH / 2 = 37.5 SQ. FT.
<br />2. TOPSOIL REPLACEMENT -
<br />PHASE IA - 6± ACRES X 43,560 SQ. FT, X 1' /27 = 9,680± C. Y.
<br />PHASE 1B ABOVE GROUND WATER ELEVATION LINE OF 5045± FT. TO 5,050±
<br />FT. OR 5 FT. ABOVE GROUND WATER ELEVATION LINE AT A 3 TO I SLOPE
<br />(15 FT,) - 4,709± L. F. X 50 *SQ. FT. / 27 = 8,720± C. Y.
<br />W - 35 FT. SETBACK + 15 FT. TO WATER LINE X 1 FT DEPTH = 50 SQ. FT.
<br />2
<br />a
<br />NOTE, TEMPORARY STORAGE OF
<br />TOPSOIL /OVERBURDEN IN 35 FOOT
<br />WIDE SPACEVAROUND PERIMETER
<br />OF PHASE 10
<br />z
<br />a
<br />R
<br />FLTON WILDLIFE SPECIAL SETBACK RESTRICTIONS
<br />1.UD &FCD APPROVAL REQUIRED FOR EXCAVATION WITHIN 400 FT. OF FUTURE
<br />WST RIGHT -OF -WAY LIMITS OF S. PLATTE RIVER CHANNEL, EXCAVATION AND
<br />BCKFILLING SHALL BE UNDERTAKEN WITHIN 100 FT, OF THE TOE OF
<br />EST SIDE OF HIGH BANK, ONLY FROM OCTOBER TO MARCH. A COPY OF UD &FCD
<br />APROVAL TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION WITHIN 400 FT.
<br />❑ FUTURE CHANNEL
<br />2 NO EXCAVATION ALLOWED WITHIN 65 FT. OF THE TOP OF THE FULTON
<br />ETCH BANK.
<br />3 PSCO APPROVAL REQUIRED FOR EXCAVATION WITHIN 200 FT, OF PSCO
<br />TWERS, AND EXCAVATION WITHIN 35 FT. OF PSCO RIGHT -OF -WAY. A COPY
<br />C APPROVAL FROM PSCO TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION
<br />BING UNDERTAKEN WITHIN 200 FT. OF PSCO. TOWERS OR WITHIN 35 FT. OF
<br />RGHT -OF -WAY,
<br />4 NO EXCAVATION SHALL OCCUR IN PHASES 1A, 1B, OR THE PLANT SITE
<br />AEA, UNTIL A WETLAND'S INVENTORY IS ACCEPTED BY THE CORP OF
<br />DGINEERS, AND A 404 PERMIT IS ISSUED ALLOWING REMOVAL OF ANY
<br />)ENTIFIED WETLANDS ALONG WITH A WETLAND'S REPLACEMENT MITIGATION
<br />LAN, A COPY OF THE WETLAND'S INVENTORY AND THE APPROVED 404 PERMIT
<br />MALL TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION IN ANY OF THESE
<br />HREE PHASES.
<br />class: emit
<br />SectbM Exhibit _. ._.> -._._._.-._. _._---- ._._._---- __-- ._._._._.-i
<br />i Class: 0 Revision
<br />_Type/s_an: -------- -------------- -- ------ - -- - --
<br />Class: D Report O Hydro llGeneral
<br />Doc Type: _ _ _ - - - -_.
<br />MApplication (Coal only) 0 Bond 0 Enforcement 0 Inspection
<br />c1,<<cr[crGc��c� c�
<br />A
<br />N
<br />W E
<br />S
<br />0 150' 300' 600'
<br />1CI�LE:o I cm TS;10,0,
<br />L�Q ft
<br />DENOTESi LIMIT OF MINING AREAS
<br />- - - - - - - DENOTESi SLURRY WALL
<br />DENOTES, LIMIT OF EXCAVATION
<br />AND PHASES
<br />e e e DENOTES; APPROXIMATE WEST RIGHT -OF -WAY
<br />LINE PROPOSED RIVER CHANNEL
<br />FULTON WTLD1 TFE CONSTRUCTION PHASES
<br />1, PHASE IA WETLANDS
<br />BACKFILL - 0
<br />2. PHASE IB
<br />BACKFILL - 4709± LINEAL FEET x 1350m / 27 = 235,450* CUBIC YARDS
<br />EXHIBIT C -2 MINING PLAN MAP NOTES
<br />SEE EXHIBIT F FOR DETAILS ON TEMPORARY AND FINAL SLOPES, SETBACKS
<br />FROM STRUCTURES, ETC,
<br />ALL LIMITS OF MINING AND SETBACKS FROM STRUCTURES, ETC. TO BE STAKED
<br />IN FIELD PRIOR TO EXCAVATION BEING UNDERTAKEN IN IMMEDIATE AREA,
<br />NO DISTURBANCE, AREAS THAT WILL NOT BE MINED OR DISTURBED, EXCEPT BY
<br />ADAMS COUNTY TRAIL CONSTRUCTION, CHANNEL IMPROVEMENTS BY UD &FCD
<br />AND /OR ADAMS COUNTY, AND FOR SUPPORT STRUCTURES AS SHOWN,
<br />FENCING ALONG TRAIL, 6' FENCING ALONG COUNTY TRAIL IS NOT PART OF
<br />CAMAS'S RESPONSIBILITY. FENCING WILL ONLY BE INSTALLED BY THE
<br />COUNTY ALONG THEIR TRAIL IF AND WHEN COUNTY DECIDES TO INSTALL TRAIL.
<br />IF COUNTY DOESN'T INSTALL TRAIL DURING MINING OPERATION, NO FENCE
<br />WILL BE INSTALLED IN THIS AREA,
<br />AREAS SUBJECT TO DISTURBANCE NO DISTURBANCE
<br />PHASE 1A - 6± ACRES 101 ACRES
<br />A PHASE IB - 25± ACRES
<br />PHASE 2 - 50± ACRES
<br />UNDERGROUND U,S. WEST CABLE ALONG PHASE 3 - 82t ACRES
<br />SOUTH SIDE OF EAST 100TH AVENUE PHASE 4 - 99± ACRES
<br />PLANT SITE - 27± ACRES
<br />P. S. CO. POWER POLES ALONG SOUTH RIVER AREA - --- - - - - -- 50± ACRES
<br />SIDE OF EAST 100TH AVENUE & ALONG
<br />BRIGHTON ROAD RIGHT -OF -WAY TOTALS - 289± ACRES 60t ACRES
<br />ICOO LEY RESERVOIR MINING/CONSTRUCTION PHASES
<br />1. SLURRY WALL CONSTRUCTION - PHASES 2, 3, & 4 = 14, 168± L. F.
<br />�\ 2. BACKFILL SLOPES -
<br />\\ PHASE 2 - 6, 472± L. F. X 1350± WSQ, FT. / 27 = 323, 600± C. Y.
<br />I \\
<br />\\ PHASE 3 - 8,730± L. F. X 1350± wSQ, FT, / 27 = 436, 500± C. Y.
<br />\ \\ PHASE 4 - 9,652± L. F, X 1350± xSQ. FT, / 27 = 482, 600± C. Y.
<br />\ r
<br />M - 30 FT. DEPTH X 90 FT. WIDTH / 2 = 1, 350 SQ. FT,
<br />3. TOPSOIL REPLACEMENT -
<br />PHASE 2 - 6, 472± L. F. X 50 )KSQ, FT, / 27 = 11, 985± C. Y.
<br />PHASE 3 - 8, 730±L. F. X 50 xSQ, FT. / 27 = 16, 167± C. Y.
<br />\\ \\ \\ \ \\ PHASE 4 - 9,652± L. F. X 50 wSQ. FT, / 27 = 17, 874± C. Y.
<br />\ \ \ \ x - 35 FT. SETBACK + 15 L. F. TO WATER LINE X 1 FT DEPTH = 50 SO. FT,
<br />\ \
<br />\ \ \ \
<br />\N N \ \ 40' EASEMENT TO CENTRAL
<br />\ \ \St
<br />COLORADO WATER CONSERVANCY
<br />DISTRICT BOOK 4894, PAGE 355,
<br />\\ R\ \ \ \ ADAMS COUNTY RECORDS
<br />`� \\ EASEMENT DETAIL
<br />/10 \ \ \\ \ SCALE, 1 =50
<br />20' EASEMENT TO THE
<br />\ \ \ \ \ CITY OF NORTHGLENN,
<br />C70 = \\ \\ \ \� BOOK 2867, PAGE 270,
<br />z \ \ \ \ \ \\ \ ADAMS COUNTY RECORDS
<br />3 M
<br />\\ \ \\ \\ \
<br />to 33' R. \ \ \ \
<br />O. W, EASEMENT \ \ \
<br />s
<br />TO SINCLAIR PIPELINE \ \\ \ ♦ \
<br />O BOOK 1140, PAGE 99, \ \ \
<br />Z ADAMS COUNTY RECORDS
<br />NORTHERLY LINE OF THE FULTON ` \ \ \ \ ` \ ♦ \
<br />FULTON DITCH AS DESCRIBED IN \ \ \ \
<br />EXHIBIT A, BOOK 2460, PAGE 323,
<br />ADAMS COUNTY RECORDS ���. \ `\
<br />South Line N, W, Sec. 16 \ \ \
<br />365. 00'
<br />S89° 57' 56' E 450. 48'
<br />CENTER COR, SEC. 16,
<br />T. 2S. , R. 67W,
<br />088867
<br />
|