Laserfiche WebLink
N7A= <br />» msm <br />N )KW <br />.1. <br />N )MYO <br />N ,.� <br />E. 100TH AVE. <br />MCKAY ROAD <br />RIGHT -OF -MAY <br />EAST- --T04TRr - -ITV N E <br />EY RESERVOIR SPECIAL SETBACK AND OTHER RESTRICTION <br />1. UD &FCD APPROVAL REQUIRED FOR EXCAVATION WITHIN 400 FT. OF FUTURE <br />WEST RIGHT -OF -WAY LIMITS OF S, PLATTE RIVER CHANNEL. NO EXCAVATION <br />ALLOWED WITHIN 100 FT. OF FUTURE CHANNEL. A COPY OF UD &FCD APPROVAL <br />TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION WITHIN 400 FT. OF FUTURE <br />CHANNEL. <br />2. SINCLAIR PIPELINE APPROVAL REQUIRED FOR EXCAVATION WITHIN 200' OF <br />PIPELINE, UNLESS DMG ACCEPTS A REVISED STABILITY ANALYSIS PROPOSING <br />LESSER EXCAVATION SETBACKS ALONG WITH APPROPRIATE MONITORING DEVICES, <br />NO EXCAVATION ALLOWED WITHIN 35 FT, OF PIPELINE. A COPY OF ANY <br />APPROVAL FROM SINCLAIR TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION <br />WITHIN 200 FT. OF PIPELINE. <br />3. PSCO APPROVAL REQUIRED FOR PERMANENT INSTALLATION OF SLURRY WALL, <br />EXCAVATION WITHIN 200 FT. OF PSCO TOWERS, AND EXCAVATION WITHIN 35 <br />FT. OF PSCO RIGHT -OF -WAY. A COPY OF APPROVAL FROM PSCO TO BE <br />SUBMITTED TO DMG, PRIOR TO SLURRY WALL INSTALLATION AND /OR <br />EXCAVATION WITHIN 200 FT. OF PSCO. TOWERS OR 35 FT. OF <br />RIGHT -OF -WAY, <br />4. PRIOR TO CONSTRUCTION OF THE SLURRY WALL, PLANS, SPECIFICATIONS, <br />AND A QUALITY ASSURANCE PLAN FOR THE SLURRY WALL CONSTRUCTION MUST <br />SUBMITTED TO THE DMG FOR REVIEW AND APPROVAL. IN ADDITION, AT THE <br />CONCLUSION OF CONSTRUCTION, THE OPERATOR MUST ALSO PROVIDE A <br />CONSTRUCTION REPORT WITH A CERTIFICATION THAT THE SLURRY WALL WAS <br />CONSTRUCTED IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS <br />06/2/99 REVISED MINING AREA, ADDED STORAGE AREAS PER RNF <br />8 <br />FULTON WILDLIFE'MINING /CONSTRUCTION PH <br />1. BACKFILL SLOPES <br />C4r <br />PHASE IA - NONE, MINING TO 1' BELOW WATER TABLE ONLY <br />PHASE 1B TO ABOVE GROUND WATER ELEVATION OF 5045± FT, WITH <br />SEDIMENTATION FROM PLANT- 4,709± L. F. X 1125± xSQ. FT. / 27 = <br />196, 210± C, Y. <br />* - 25 FT, DEPTH X 90 FT, WIDTH / 2 = 1,125 SQ, FT. <br />PHASE 1B TO FROM ABOVE GROUND WATER ELEVATION LINE OF 5045± FT. TO <br />5,045 FT. OR 5 FT, ABOVE GROUND WATER ELEVATION LINE AT A 3 TO 1 <br />SLOPE (15 FT.) - 4,709± L. F. X 37.5 *SQ. FT, / 27 = 6,550± C. Y. <br />x - 5 FT. DEPTH X 15 FT. WIDTH / 2 = 37.5 SQ. FT. <br />2. TOPSOIL REPLACEMENT - <br />PHASE IA - 6± ACRES X 43,560 SQ. FT, X 1' /27 = 9,680± C. Y. <br />PHASE 1B ABOVE GROUND WATER ELEVATION LINE OF 5045± FT. TO 5,050± <br />FT. OR 5 FT. ABOVE GROUND WATER ELEVATION LINE AT A 3 TO I SLOPE <br />(15 FT,) - 4,709± L. F. X 50 *SQ. FT. / 27 = 8,720± C. Y. <br />W - 35 FT. SETBACK + 15 FT. TO WATER LINE X 1 FT DEPTH = 50 SQ. FT. <br />2 <br />a <br />NOTE, TEMPORARY STORAGE OF <br />TOPSOIL /OVERBURDEN IN 35 FOOT <br />WIDE SPACEVAROUND PERIMETER <br />OF PHASE 10 <br />z <br />a <br />R <br />FLTON WILDLIFE SPECIAL SETBACK RESTRICTIONS <br />1.UD &FCD APPROVAL REQUIRED FOR EXCAVATION WITHIN 400 FT. OF FUTURE <br />WST RIGHT -OF -WAY LIMITS OF S. PLATTE RIVER CHANNEL, EXCAVATION AND <br />BCKFILLING SHALL BE UNDERTAKEN WITHIN 100 FT, OF THE TOE OF <br />EST SIDE OF HIGH BANK, ONLY FROM OCTOBER TO MARCH. A COPY OF UD &FCD <br />APROVAL TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION WITHIN 400 FT. <br />❑ FUTURE CHANNEL <br />2 NO EXCAVATION ALLOWED WITHIN 65 FT. OF THE TOP OF THE FULTON <br />ETCH BANK. <br />3 PSCO APPROVAL REQUIRED FOR EXCAVATION WITHIN 200 FT, OF PSCO <br />TWERS, AND EXCAVATION WITHIN 35 FT. OF PSCO RIGHT -OF -WAY. A COPY <br />C APPROVAL FROM PSCO TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION <br />BING UNDERTAKEN WITHIN 200 FT. OF PSCO. TOWERS OR WITHIN 35 FT. OF <br />RGHT -OF -WAY, <br />4 NO EXCAVATION SHALL OCCUR IN PHASES 1A, 1B, OR THE PLANT SITE <br />AEA, UNTIL A WETLAND'S INVENTORY IS ACCEPTED BY THE CORP OF <br />DGINEERS, AND A 404 PERMIT IS ISSUED ALLOWING REMOVAL OF ANY <br />)ENTIFIED WETLANDS ALONG WITH A WETLAND'S REPLACEMENT MITIGATION <br />LAN, A COPY OF THE WETLAND'S INVENTORY AND THE APPROVED 404 PERMIT <br />MALL TO BE SUBMITTED TO DMG, PRIOR TO EXCAVATION IN ANY OF THESE <br />HREE PHASES. <br />class: emit <br />SectbM Exhibit _. ._.> -._._._.-._. _._---- ._._._---- __-- ._._._._.-i <br />i Class: 0 Revision <br />_Type/s_an: -------- -------------- -- ------ - -- - -- <br />Class: D Report O Hydro llGeneral <br />Doc Type: _ _ _ - - - -_. <br />MApplication (Coal only) 0 Bond 0 Enforcement 0 Inspection <br />c1,<<cr[crGc��c� c� <br />A <br />N <br />W E <br />S <br />0 150' 300' 600' <br />1CI�LE:o I cm TS;10,0, <br />L�Q ft <br />DENOTESi LIMIT OF MINING AREAS <br />- - - - - - - DENOTESi SLURRY WALL <br />DENOTES, LIMIT OF EXCAVATION <br />AND PHASES <br />e e e DENOTES; APPROXIMATE WEST RIGHT -OF -WAY <br />LINE PROPOSED RIVER CHANNEL <br />FULTON WTLD1 TFE CONSTRUCTION PHASES <br />1, PHASE IA WETLANDS <br />BACKFILL - 0 <br />2. PHASE IB <br />BACKFILL - 4709± LINEAL FEET x 1350m / 27 = 235,450* CUBIC YARDS <br />EXHIBIT C -2 MINING PLAN MAP NOTES <br />SEE EXHIBIT F FOR DETAILS ON TEMPORARY AND FINAL SLOPES, SETBACKS <br />FROM STRUCTURES, ETC, <br />ALL LIMITS OF MINING AND SETBACKS FROM STRUCTURES, ETC. TO BE STAKED <br />IN FIELD PRIOR TO EXCAVATION BEING UNDERTAKEN IN IMMEDIATE AREA, <br />NO DISTURBANCE, AREAS THAT WILL NOT BE MINED OR DISTURBED, EXCEPT BY <br />ADAMS COUNTY TRAIL CONSTRUCTION, CHANNEL IMPROVEMENTS BY UD &FCD <br />AND /OR ADAMS COUNTY, AND FOR SUPPORT STRUCTURES AS SHOWN, <br />FENCING ALONG TRAIL, 6' FENCING ALONG COUNTY TRAIL IS NOT PART OF <br />CAMAS'S RESPONSIBILITY. FENCING WILL ONLY BE INSTALLED BY THE <br />COUNTY ALONG THEIR TRAIL IF AND WHEN COUNTY DECIDES TO INSTALL TRAIL. <br />IF COUNTY DOESN'T INSTALL TRAIL DURING MINING OPERATION, NO FENCE <br />WILL BE INSTALLED IN THIS AREA, <br />AREAS SUBJECT TO DISTURBANCE NO DISTURBANCE <br />PHASE 1A - 6± ACRES 101 ACRES <br />A PHASE IB - 25± ACRES <br />PHASE 2 - 50± ACRES <br />UNDERGROUND U,S. WEST CABLE ALONG PHASE 3 - 82t ACRES <br />SOUTH SIDE OF EAST 100TH AVENUE PHASE 4 - 99± ACRES <br />PLANT SITE - 27± ACRES <br />P. S. CO. POWER POLES ALONG SOUTH RIVER AREA - --- - - - - -- 50± ACRES <br />SIDE OF EAST 100TH AVENUE & ALONG <br />BRIGHTON ROAD RIGHT -OF -WAY TOTALS - 289± ACRES 60t ACRES <br />ICOO LEY RESERVOIR MINING/CONSTRUCTION PHASES <br />1. SLURRY WALL CONSTRUCTION - PHASES 2, 3, & 4 = 14, 168± L. F. <br />�\ 2. BACKFILL SLOPES - <br />\\ PHASE 2 - 6, 472± L. F. X 1350± WSQ, FT. / 27 = 323, 600± C. Y. <br />I \\ <br />\\ PHASE 3 - 8,730± L. F. X 1350± wSQ, FT, / 27 = 436, 500± C. Y. <br />\ \\ PHASE 4 - 9,652± L. F, X 1350± xSQ. FT, / 27 = 482, 600± C. Y. <br />\ r <br />M - 30 FT. DEPTH X 90 FT. WIDTH / 2 = 1, 350 SQ. FT, <br />3. TOPSOIL REPLACEMENT - <br />PHASE 2 - 6, 472± L. F. X 50 )KSQ, FT, / 27 = 11, 985± C. Y. <br />PHASE 3 - 8, 730±L. F. X 50 xSQ, FT. / 27 = 16, 167± C. Y. <br />\\ \\ \\ \ \\ PHASE 4 - 9,652± L. F. X 50 wSQ. FT, / 27 = 17, 874± C. Y. <br />\ \ \ \ x - 35 FT. SETBACK + 15 L. F. TO WATER LINE X 1 FT DEPTH = 50 SO. FT, <br />\ \ <br />\ \ \ \ <br />\N N \ \ 40' EASEMENT TO CENTRAL <br />\ \ \St <br />COLORADO WATER CONSERVANCY <br />DISTRICT BOOK 4894, PAGE 355, <br />\\ R\ \ \ \ ADAMS COUNTY RECORDS <br />`� \\ EASEMENT DETAIL <br />/10 \ \ \\ \ SCALE, 1 =50 <br />20' EASEMENT TO THE <br />\ \ \ \ \ CITY OF NORTHGLENN, <br />C70 = \\ \\ \ \� BOOK 2867, PAGE 270, <br />z \ \ \ \ \ \\ \ ADAMS COUNTY RECORDS <br />3 M <br />\\ \ \\ \\ \ <br />to 33' R. \ \ \ \ <br />O. W, EASEMENT \ \ \ <br />s <br />TO SINCLAIR PIPELINE \ \\ \ ♦ \ <br />O BOOK 1140, PAGE 99, \ \ \ <br />Z ADAMS COUNTY RECORDS <br />NORTHERLY LINE OF THE FULTON ` \ \ \ \ ` \ ♦ \ <br />FULTON DITCH AS DESCRIBED IN \ \ \ \ <br />EXHIBIT A, BOOK 2460, PAGE 323, <br />ADAMS COUNTY RECORDS ���. \ `\ <br />South Line N, W, Sec. 16 \ \ \ <br />365. 00' <br />S89° 57' 56' E 450. 48' <br />CENTER COR, SEC. 16, <br />T. 2S. , R. 67W, <br />088867 <br />