My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56529
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:05 PM
Creation date
11/20/2007 5:06:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 48 Drainage Modifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />Dared R. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTO N, Director <br />Richard D. Lamm <br />Governor <br />June 18, 1986 <br />Mr. Dennis Conn <br />West Elk Coal Company <br />P.O. Box 591 <br />Somerset, Colorado 81434 <br />Re: tot. Gunnison No. 1 Mine Technical Revision, File No. C-80-007 <br />Dear Mr. Conn: <br />The Division has reviewed the revision application submitted June 4, 1986 <br />which addresses installation of an automatic dewatering device in the Bear <br />Pond. Since this revision entails changes to a designed structure, it will be <br />processed as a technical revision. <br />• The revision application has been found to be complete. Please have the <br />enclosed Public Notice published once in a local paper. <br />Following are our adequacy comments: <br />1. Attachment G-Pond Sections should contain a cross section of the <br />embankment and the emergency spillway, including slope and width. The <br />subtitle for Attachment G should read Sediment Pond MB-5 Bear No. 1 <br />Portal Area. <br />2. The applicant (WECC) should submit appropriate acreages of disturbed <br />areas, curve numbers used, assumptions made, and calculations used to <br />determine water and sediment volumes. <br />3. The applicant should submit a stage-storage chart of stage vs. volume <br />which identifies the following points along the stage axis: 60% <br />sediment cleanout level, 100% sediment level, and 10 year-24 hour water <br />volume to verify proper pond design. <br />4. The applicant should submit peak flow calculations for a <br />25 year-24 hour precipitation event for Pond MB-5 along with <br />calculations and sizing information to verify appropriate emergency <br />spillway size. <br />5. The applicant should submit calculations used to determine detention <br />. time and sizing of the dewatering device. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.