Laserfiche WebLink
DEPARTAIENT OF NATURAL RESOURCES <br />D Monte Pasc or E.ecui~•r D~reuor <br /> <br />Arc harp D Lamm <br />Go.err•or <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SNELTON, Director <br />J~ <br />June 2, 1983 <br />T0: Boo Liddle <br />FROM: Roy Cox <br /> <br />RE: Review of the Mine Plan Changes for the tot. Gunnison No. 1 Mine <br />File No. C-U07-80 <br />I have reviewed the mine plan changes submitted by West Elk Coal Company, <br />Inc. for the Mt. Gunnison No. 1 Mine. The changes in mining sequence and <br />direction of mining will not effect the hydrology finding within the <br />permit document (e.g., there will be no foreseeable additional impacts to <br />surface and ground water). <br />~~ No mention was given of locating the two monitoring wells over the first <br />( • subsidence panel in this submittal. West Elk Coal Company, Inc. is still <br />bound by Stipulation No. 15, page 16 of the permit document, to install <br />these monitoring wells. These monitoring wells are to be located over <br />the panel, installed one year prior to any mining within the panel, and <br />~ monitored for water levels monthly. A completion report for each well <br />showing the well location, lithology, casing, screening, seals, and <br />backfilling must also be submitted, as required in Stipulation 16, page <br />. 16. <br />/mt <br />cc: Jim Pendleton <br />Ed Bischoff <br />uoc. No. 321[ <br />:~ <br />d23 Centennial Builtling, t3t3 Sherman Street Denver. Coloratlo 80203 Tel. (3031 866-3561 _. <br />