Laserfiche WebLink
<br />Exhibit 48 - Contents <br />^ (9-83) MR to construct a permanent sediment control ditch <br />^ (li-8S) MR to place culvert under the equipment building <br />parking lot <br />^ (6-85) Improvement of drainage on portal bench <br />^ (3-83) TR to change the mine plan (change in direction of the <br />main portal entries and sequence of mining) <br />^ (5-86) MR to install a dewatering pipe in MB-5 <br />* Compiled by the Division <br />• <br />~~ <br />