My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56528
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:05 PM
Creation date
11/20/2007 5:06:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980203
IBM Index Class Name
Permit File
Doc Name
LIMITED IMPACT 110 & SPECIAL TEN DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
117 Permit Application (cont'd)- <br />' INS'f itUC:I01:S: Th;s appllcacio~d a~c companyinq maccri als must b~u hm~ in <br />duplicate. In the interests of efficiant pro.:e ssinq, plaaaa .n..ude <br />following into ration -d I~catt -~__.. _.,- o_„o <br />Chv' ~ ~.~ ~~. .._~ __.. ~r___.__.._ __- <br />3 for guidance; Special 10-day Pe rmits ,, see RULE + for guidance. <br />ESHIB IT ?. - Legal Description <br />She legal description must Sdentify the affected land and be wholly adequate For field <br />location of the property. It can be Sn the fpm of metes b bounds surrey or a descrip- <br />tion by reference Co township, range, and section, to a[ least [he nearzst quarter- <br />quarter section. Where applicable, the street address or lot number(s) my be used. <br />EQ?IBIT B - ?fining Plan <br />This can be a general discussion of the methods, equipment, phases or stages of the <br />operation and those portions of land affected by each. She plan should be correlated <br />with the map and should show where extraction will begin, and which direction, if any, <br />it will proceed. <br />EXNLB IT C - Map <br />This map should clearly define permit boundaries and indicate all roads or stockpile <br />areas to be used in connection with the operation. All im;aediately adjacent landowners <br />must be shown. The quarter section corner, section line, or any other locateable <br />points should also be shown on this map. <br />ERRIBIT D - S7ildlife. Water Resources, Vegetation and Soils Inforaation <br />Each of the above~en[ioned subjects gust be addressed as outlined in the applicable <br />RULE. L <br />E:{YIBIS E - Reclamation Plan ;~ !'~ <br />As with the mining plan, this should be a general discussion of the methods, equipment, <br />phases or stages of the reclamation process and those portions of land affected by each. <br />If possible, the plan should be closely correlated with the map. If not, the narrative ` <br />must be comprehensive enough co draw an accurate verbal picture of the expected appear- <br />ance of the area after completion of reclamation. _ <br />EYiiI3IT F - Proof of Local Government Approval '•~ ~• ( 1 <br />This must be a letter from the local government specifying conformance with existing <br />zoning regulations. (It is intended that operators may obtain local government approval <br />concurrent :ri t4 the Dit-ision's processing of the application. To do so, the operator <br />must su'vmit e•idence which indicates that local government approval is currently pending <br />or will at least be considered within a reasonably short time by the appropriate govern- <br />ing body RULE 1.1(10) (Consult this RULc- for full details on this requirement.) <br />F.{H?B IT ~ - Source of Leoa1 Hight to Enter ~.i r~ <br />i " <br />This could be a copy of the'lease, deed, abstract of title, or current tax receipt. <br />An acceptable alternative would be a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mice. <br />ERFiI3IT H - Reclamation Costs ~ <br />'. 7 <br />Tor a 110 permit, if the operator requests surety to be less than $2500, the operatorrus[ <br />submit facts to support such a request. Other+ise, a surety of 52500 will automatically <br />be set. For all 111 permits, the surety shall be $25C0 per acre. <br />E!OIIBIT I - Tarns of Gove nmental Contracts <br />For Special 10-Day (111) Permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a special 10-d ay permit. The operator must <br />also submit evidence of the surety provided under the governmental contract, if it vas <br />required. <br />NOTZCE PROCEDURES <br />After the application is considered "filed" (pursuant to RULE 1.1(10) with the Mined <br />Land Reclamation Division, notice procedures outlined in RULES 3.2 and/or 4.2 rsust be <br />fol'_os.-ed. (Format for such notices will be included in the letter you receive from the <br />bII.R staff informing you of the completeness ("filing") of your application. <br />ADDITIONAL INF02`"ATION <br />This space can be referenced for further information of any of the items on this fpm. <br />To the best of my knowledge, all the info z-iat ion presented in this application is true <br />and correct. <br />//~,~ oD t <br />BY LL~c~l~Le,n ~DL,I~Lt..ts`J <br />IITL~ <br />(Sic•ied b~~ in~:~•:.iua! 1:~_-i11:: a~ttaor_ <br />ie~d to Sint can ep~racor to tai; <br />c. '.c:.__'n.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.