Laserfiche WebLink
2o'To 114 come <br />4k30' To 114 Corner <br />200. 0 200 400 <br />Exibit F <br />NOTES <br />1. Final side slopes shall be 4:1 minimum. <br />2. The subsoil material stored in stockpiles shall <br />be used to cover the spoil material and to <br />establish a final grade prior to applying the <br />topsoil material. <br />3. The topsoil material must be applied uniformly <br />over the area at a depth of at least twelve <br />inches. <br />4. All areas that have been disturbed by contractors <br />processing equipment, stockpile sites, roads, ect.. <br />shall be reclaimed and seeded. <br />5. As mining progresses, systematic reclamation <br />should be accomplished. Stability of the stockpiles <br />shall be obtained by seeding with adapted grasses <br />at least once a year. Ditches and dikes shall be <br />constructed as required to limit water erosion. <br />1:2,cs i's�e-a <br />X e'Ae S k0 6 G a '4"( <br />«— <br />9ver-441ar� <br />IN�I�Inn !nllll!!Ill�lil�!illli!I�li� <br />0 0 0 0 9 8 2 5 <br />SCALE OF FEET <br />i- <br />