Laserfiche WebLink
<br />• <br /> <br />TABLE OF CONTENTS (CONT'D) <br />4.0 <br />DISCUSSION AND RECOt'AfENDATIONS (CONT'D) <br />4.3 PROPOSED CONSTRUCTION <br />4.3.1 Waste Rock Pile <br />4.4 RECLAIMED FACILITIES <br />4.4.1 Crushing and Screening Level Fill <br />4.4.2 Other Fills <br />4.4.3 Diversion Channel Cut <br />4.4.4 Other Soil Cuts <br />4.4.5 Rock Cuts <br />4.4.6 Waste Rock Pile <br />4.5 SURFACE WATER DIVERSION <br />REFERENCES <br />APPENDIX A - FIELD INVESTIGATION <br />APPENDIX B - LABORATORY TESTING <br />APPENDIX C - ANALYSES <br />ii <br />PAGE: <br />29 <br />29 <br />34 <br />34 <br />34 <br />35 <br />35 <br />36 <br />37 <br />38 <br />GEO-HYDRO CONSULTING.INC. <br />