Laserfiche WebLink
(~tU-11YUIlU I.UIVJULI IIVI~, IIVI.. v485 West Coltdx Avenue <br />Consultants in Georechnicai and Denver, Colordtlo 80215 <br />Hydroiogicai Engineering telephone (303) 232-632n <br />• <br />May 15, 1982 <br />• <br />Colorado Westmoreland, Inc. <br />P.O. Box E <br />Paonia, Colorado 81428 <br />Attention: Mrs. Patricia M. Farnsworth <br />Mine Engineer <br />Gentlemen: <br />This letter transmits 25 copies of our "Report, Phase <br />II Geotechnical Studies, Orchard Valley Coal Mine, Paonia, <br />Colorado, for Colorado Westmoreland Inc." <br />These studies were planned in consultation with repre- <br />sentatives of Colorado Westmoreland, Inc., and of Colorado <br />Mined Land Reclamation. A draft of the report was submitted <br />for review to bor.h these organizations, and resulting com- <br />ments have been incorporated into this final report. <br />Our report identifies specific areas where our stability <br />analyses indicate potential problems may exist, and provides <br />recommendations as to how we believe these potential problem <br />areas should be handled. In particular, we consider that a <br />program of regular monitoring of slope deformations using in- <br />clinometers, and pore water pressures using pressure trans- <br />ducers, should be implemented in the more critical areas to <br />supplement regular visual inspections. We believe this ap- <br />proach is suitable prior to final reclamar_ion since our analy- <br />ses indicate that the present slopes under the existing condi- <br />tions do not constitute an imminent hazard of a large failure. <br />We have enjoyed working with you on this interesting pro- <br />ject, and hope that we can be of continuing assistance to you <br />at the Orchard Valley mine. <br />Very truly yours, <br />CEO-HYDRO CONSULTING, INC. <br />Plichal Bukovansky <br />Yresident <br />C J <br />Enclosures <br />MB/jw <br />