Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />• J. EARTXl10RK - TOPSOIL/SUBSOIL REPLACEMENT 8 SPECIAL HANDLING <br />Task tf~ Task Descri pticn ~ Cost (f) <br />54 ~ Replace Topsoil from Stockpile to Previously Disturb 5999 <br />55 ~ Replace Topsoil from Stockpile to Sanborn Creek Ares f7, 160 <br />56 ~ Replace Topsoil from Stockpile to East Refuse Area ~ 52,832 <br />57 ~ Replace Topsoil from Stockpile to Nest Valley Fill ~ 515,318 <br />58 ~ Replace Topsoil from Stockpile to Substation No. 3 ~ 31,042 <br />59 ~ Replace Topsoil from Stockpile to Elk Creek Mine Ar~ f10, 866 <br />~ ~ <br />~ ~ <br />• <br />Subtotal (J): 538,217 <br />• sheet 6 of 10 <br />