Laserfiche WebLink
• CIRCES Cost Estlmatlnt~$oftwara <br /> BULLDOZER WORK <br /> PROJECT IDENTIFICATION <br />Agenry or organization name :Colorado Divrsion O/ Mrnera/s Antl Geology <br /> <br /> Teske: 051 State:Colorado Pennivobe:C$1-022 <br /> Date : O6"01/2000 County : De/fa Abbreviation :none <br /> User: JRS Site: Sanborn Greek Mine Filename:C022-051 <br /> <br /> Permit or other joh action :Technical Revision 32 -New Elk Creek Facdrties <br /> <br /> Task dexnption : Regrade Pond D <br /> <br /> HOURLY EQUIPMENT COS7 Basic machine :Car O6N (1996) Horsepower: 285 <br /> Blade type : SemrUnrversal <br /> Anachment no. 1 : BOPS Cab Shin basis : 1 per day <br /> Anachment no. 2 : NA <br /> Utilization Cost data source: (CRG) <br /> Cast Breakdown : Ownership mst/hour: A35. 17 NA <br /> Operating cosVhour: E55.64 1W <br /> Ripper op. cosVhour: 50.00 NA <br /> Opeator cosMour: 523.12 NA <br /> Total unit cosdhour: 5117.93 Total fleet cosvhour: Si 1393 <br /> <br />• MATERIAL OUANTRIES <br />Initial Swell Loose <br />volume: 11,000 CCY )actor: 7.165 volume: 12,875 LCY <br />Source of quantity lakeon :Division Esfimefe <br />Source of est. swell tacror :CAT Handbook <br />. - - l <br />HOURLY PRODUCTION <br />Average Dush distance : 175 feet Source <br />Unadjusted hoary production : 512 LCY/hr <br />Material consistency dexdplbn <br />l`n.nr.e"M R'll n~ ~mAenln~nn, <br />Average push gradient : 1000 Y. (pos) <br />Aveage site alliNde : 6,200 lest <br />Material weigh) : 3.300 IbsrLCY <br />Material weigh) descnption <br />Decomposed rock - 75 a Rock. 25% Earth <br />JOB TIME AND COST <br />Fleet size: 1 Dozens) <br />Operator dull : 0.75 (avg <br />Malenal consistenry : 0.90 (Carl <br />Dozing method : 1.00 (ger <br />Visibiliy : 7.00 (BVs <br />Job eKdenry : 0.63 (lshrle <br />Spoil ple : 0.70 (/nd-i <br />Push gradient : 0.79 (Carl <br />AltiNde : 100 (Carl <br />Material weight : 0.70 (Carl <br />Blade type : 1.00 /S pr <br />Net correction : 0.21 <br />Atllusted unit protluution : 110. IS LCY/hr <br />Atllusted Ileet production : 110.15 LCY/hr <br />Total lob time: 116.34 Hours <br />Unit cast : 51.0.3a /LCY Total job cost : 573,255 <br />