Laserfiche WebLink
<br />61RCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />r-~«:r ._5~1- -:x:3:53 <br /> Agency or organization name : Coloratlo Division OI Minerals Antl Geology <br />Task a: 021 Sute: Caloradp PermiVOb a:C-81-022 <br />Date: 0601/2000 County Delta Abbreviation :none <br />User. JRS Site :Sanborn Creek Mine Filename :0022-02f <br />Permit or other job action :Technical Rew'sion 32 -New Elk Creek Facilities <br />Task descnption :Rip All Surlace Facility Areas <br />Y EOUIPMEN7 COST Basic machine:Cal DeN (1996) Horsepower: 285 <br />Blade type : SemrUnrversal <br />Attachment no. 1 : ROPS Cab Shill basis : 1 per tlay <br />Attachment no. 2 : J-snank ripper <br /> Utilization % Cost data source : (CRG) <br />Cost Breakdown : Ownership cosMour : 501.10 NA <br />Operating cosMour: 555.60 100 <br />Ripper op. cosVhour: 56.90 100 <br />Operator cosMpur: E23.72 NA <br />Total unit cost/hour: 5126.60 <br />L <br />Total Meet cosVhr: $126.80 <br />Selectetl estimating methotl : Alegi <br />Laatl lador: NA Bank volume: NA BCV <br />Rip depth (h): 2.00 volume: 291,045 BCY Or CCY <br />Soume of quantity ukecH :Page 2.05-20 <br />Soume of material loatl lector: NA <br />Seismic method: Material seismic velocity : NA legit per second <br />Unatljuste0 houly pmductbn : NA BCY or CCY/hr <br />Area method : Average dDPing depth per pass: 2. Q7 teal <br />Aveage ripping width per pass: 7.08 lest <br />Aveage ripping length per pass: 100.00 last <br />Averega velocity of machine : 88.00 lest per minute <br />Average machine maneuver time /pass: 0.25 minutes <br />Hourly production par unit area : 0.70.7 acres per hour <br />Unadjustetl hourly pmtluction : 2,269.73 BCY or CCY/hr <br /> Coneclicn lectors : Unatltusted Koury productbn : 2.269.73 BCY or CCY/hr <br /> Site altitude : 6.200 legit <br /> Altitude adjustment: I.00 (Cat HB) <br /> Job efficiency lector: 0.83 (1 sniNday) <br /> Net lob correttion: 0.63 multiplier <br /> Adjusted howdy unit pmtluction : 1,863.67 BCY or CCY/hr <br /> Adjusted howdy Ilea[ production: 1,883.87 BCY Or CCY/hr <br />• JOB TIME AND COST <br /> Fleet Size : 1 Dozers) Total job time : 154.49 Hours <br /> Unit cost : 50.067 /LCY Total job cost : $19,589 <br />Seismic <br />method: NA NA <br />Area <br />meMOtl: 90.20 Acres <br />