Laserfiche WebLink
<br />i <br />Task e <br />Date <br />User <br />CIRCES Cost Estimating Sokware <br />COMPACTION WORK <br />Agenry or organization name :Colorado Dnision Ol Minerals And <br />016 Slate :Colorado <br />O7Jun~2000 <br />JRS <br />Cpunry:Derta <br />Site : Sanborn Creek Mme <br />Permit or other joD action :7echniral Revision 72 ~ New Elk Creek Facilities <br />Task description :Compact Steep Slope Areas and Coal Stockpile Material <br />HOURLY EQUIPMENT COST Make and model:CAT 8158 (7996) Horsepower: 116 <br />Compactor type : Reclamalron Shill Dasis : 1 per day <br />Loose <br />volume <br />reakdown : Ownership wsUnour <br />Operating cosMour <br />Operator msVhour <br />Total unit cosVhaur <br />3 <br />Shdnkaga <br />Uulizaaon Y. Cost tlata source : (CRG) <br />$11.12 NA <br />835.00 700 <br />327.12 NA <br />399.57 total fleet msVhour: 599.53 <br />Compaced <br />181,000 LCV lector: 0.875 volume: 161,000 <br />Source of quantity fakeotl :Estimate 1? of All BacMill Mafeda/ andAll Stockpile Material <br />Source of material shrinkage factor : CA T Handbook <br />Elements ~ Compamed width per pass : 6.12 feet <br />Average compactor speed: 4.00 mph <br />Compacted thickness of each lilt : 12.00 inches <br />Conversion constant : 16.3 <br />Regwretl numoer of machine passes: 4 passea <br />Unatljusted houry unit production: 1.255.75 CCY/hr <br />Job Contlition Cortedion Factors <br />Site altitutle : 6.750 leer <br />• JOB TIME AND COST <br />Fleet size: 1 ComDactor(s)U <br />Unit cost : 30.096 /CCY <br />CCY <br /> Souce <br />Altitutle atljustmant factor: 0.99 (Cat HB) <br />Job edidenry lector: 0.83 (I ShitUday) <br />Net joD coneaion: 082 multiplier <br />Adjusted houry unit production : 1,031.85 CCYrtv <br />Adjusted houry fleet production : 1,031.85 CCV/hr <br />PermNob s : C-81-022 <br />ADbreviabon :none <br />Filename : C022-016 <br />Total job Gme : 156.03 Hours <br />Tout job cost : 515,530 <br />