Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />11 I, <br />u <br />• <br />P. NI SCELLANEOUS RECLAMATION TASKS <br />Task p1 Task Description 1 <br />______I____________________________________________________I <br />T3 I Regrade Primary Riprap Area 1 <br />74 I Regrade Secondary Riprap Area 1 <br />75 I Remove Gravel from Substation No. 3 to Sediment Ponl <br />92 I Yearly Site Maintenance 1 <br />94 I Pond Cleaning 1 <br />I I <br />I THE FOLLONING TASKS ARE FROM THE ORIGINAL APPROVED I <br />I EST 1lIATE; SO)IE OF THE TASK NUMBERS MAT OVERLAP 1 <br />I CURRENT TASKS: 1 <br />I I <br />OLD 731 Hubbard Creek Fan Area (Three Pages) 1 <br />OLD 741 Bear Canyon Fan Area (Three Pages) 1 <br />OLD 751 Upper Hubbard Creek Fan Site (Four Pages) 1 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I 1 <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />l I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />I <br />I <br />Cost (5) <br />f5,098 <br />512,915 <br />5221 <br />s)a,73z <br />560,000 <br />524,093 <br />530,182 <br />526,575 <br />Subtotal (P): f777, 876 <br />• sheet 9 of 10 <br />