Laserfiche WebLink
<br />Mmual Inspection <br />EMEF2GENCY SPILLWAY <br />fond: <br />Dale: --~~]~ ._. _ <br />1). Does it appear that the emergency spillway has discharyed water since the last incpeclion"% <br />Yes hIn (/ <br />2). Is erosion occurring at any section of the emeryency spillway? <br />Yes Idr~ L-~ <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Flas the design storage capacity o(the reservoir been surpasse~l'~ <br />Yes Nu ~ <br />Elevation of Water Surface: 6969 <br />Estimated Water Depth in feet: <br />Elevation to top of Sediment: ,(y~ ~ <br />OTHER OBSERVATIONS <br />~L~~ <br />MSFiA Q//ualified Impoundment Inspector <br />_ /0~6 /6 L/ <br />Date <br />.~ ~ , ;,, <br />!'~~ r ~ . ~~ ~ ~, <br />c~- ~-.~ <br />Professional Enyineer Directing Inspeohdi r(' <br />;; <br />Date <br />Faye 2 <br />Gye/'L O~OSer~~ _ <br />