Laserfiche WebLink
1 c <br /> <br />ANNUAL SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(15) <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No v <br />No v <br />No v <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />No ~~ <br />Mine: Lorencito <br />NPDES ID. No.: Pond #10A-Loadout <br />Inspection Period: Second Quarter 2004 <br />Inspection Date: 6/10/2004 <br />General Description or Reference to Site Plan: <br />This pond is located east of the coal loadout facility and south of the railroad tracks <br />The pond is partially incised into alluvium and the embankment keyed into the <br />subsurface' strata. Side sopes are less than 2H:1V. The pond discharges into Lorencito <br />Canyon Creek. <br />EMBANKIIAENT <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Excellent Moderate Few Poor <br />Extensive Some Fe None <br />Yes v No <br />Yes L No <br />Yes /~~ No <br />Yes No ri <br />Just starting None <br />Page 3 <br />