Laserfiche WebLink
n <br />completion of each phase of mining, trees and shrubs will be transplanted to the edge of <br />ponds. <br />Wherever a powerline crosses the subject property, the applicant is obliged to provide <br />adequate clearance from the existing ground elevation. With this in mind, the <br />berms/landscaping will either be constructed so that they aze faz enough away so as not to <br />interfere with these lines, or the vegetation employed will be of a small enough maximum <br />height that they will not reach the clearance minimum under the power lines. <br />Additionally, elevations of berms A and B are included to provide a visual of the <br />screening effect achieved by this berming and landscaping plan. For the number of <br />shrubs and trees to be planted, species to be used, and location of individual species on <br />berms, see the attached plan view (Typical Berm Details A and B, sheet 2 of 3). <br />Specifications for the application of mulch and fertilizer are detailed on the Berming and <br />Landscaping Plan (General Notes, sheet 1 of 3). <br />