1 <br />1 <br />' P[IN=NG PLAPI <br />E X H Z S I T D <br />' At this time, approximately 2.8 ecrea of this site are <br />disturbed from past mining activity, which includes a topsoil <br />stockpile, roeda, plant site and .6 acre pond eree. The proposed <br />' mining end reclamation plan is to expend the existing pond to <br />approximately 6.5 ecrea end to mine and reclaim the remainder of <br />the site ea discussed and illustrated in this application. <br />' Phaae I of the mining plan is to continue mining in e <br />westerly direction with the plant site location as shown. The <br />plant site will be relocated for Phesea II end III. Location <br />' and direction of mining are indicated on the map. <br />Eerthmoving, excavating, end topsoil salvaging activities <br />' will be conducted using a dozer, beckhoe, scraper and haul <br />trucks. <br />Materiels processing equipment at the plant site includes a <br />acreener and crusher. Materiels will not be washed during <br />processing. There is no water requirement for operations other <br />than approximately .2 acre-foot per yenr for duet suppression. <br />' This water may be supplied from the dewatering operation or <br />trucked to the site. <br />' Wnter impoundment is not a part of this operation. Historic <br />runoff from a slough aren, North of the site, drains into the <br />existing pond at this time. This water, with additional tempor- <br />ary water from the discharge operation will be pumped into Eaton <br />Ditch per en agreement with the ditch and water rights owners. <br />Minor Diaturbence - Approximately 9,250 yda3 of topsoil, <br />' nixed with fertilizer, occupies .57 acres et the Weat permit <br />boundary. The plant site area is .5 ecrea. <br />Moderate Diaturbence - Grading activity includes 2.6 ecrea <br />' of shoreline and 2.2 acres of land area edlacent to the shore- <br />line, totalling 4.8 ecrea Csay 5 acres). Temporary haul roeda <br />will be no greater than .25 ncrea. <br /> <br />1 <br /> <br />1 <br />Minor Disturbance - Maximum eree to be seeded is 1 acre of <br />shoreline (2,300 lineal feet et 20 £eet wide) and 2.2 ecrea of <br />surrounding lend arse. <br />Operations ere expected to lest approximately 15 to 20 <br />years. The site will be mined and reclaimed in three phases, <br />each lasting approximately five to seven years. The location <br />and direction of mining each phnae is ea shown. Shoreline <br />revegetation will take place when feasible ea it is established. <br />D-1 <br /> <br />