Laserfiche WebLink
1 <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />RECLAMAT=OBI pLABI <br />E X H I B I T E <br />The reclamation plan includes 6.5 scree of surface water <br />with vegetated shoreline. The remaining land area will be <br />revegeteted grassland with a property access road along the site <br />perimeter. Refer to Exhibit F, the Reclamation Plan Map. <br />Implementation of the reclamation plan according to the <br />performance standards o£ Rule 6, is as follows: <br />Grading <br />The East shoreline of the existing pond is no steeper than <br />3H:1V at this time. Minimal final dressing end revegetation <br />will begin upon permit issuance, season permitting. <br />Aa mining continues and the pond is expanded, the shoreline <br />will be adequately compacted and stabilized. <br />Grading will be done in a manner preventing any erosion or <br />siltation of the affected lands. <br />There are no toxic or acid producing materials associated <br />with this operation. <br />Shoreline stabilization will be completed as soon es <br />feasible after the mining process. Concrete riprap will be <br />placed on the shoreline for stabilization. All of the concrete <br />riprap will be below the water line. <br />There will be no drill or auger holes, eddits or shafts <br />constructed in this operation. No refuse will be mined. <br />Grading will be conducted to establish a minimum 3H:1V slope <br />from 5 feet above to 10 feet below the expected water line. A <br />2H:1V elope will then be established beginning et the end of the <br />3H:1V elope end extend to the bottom of the excavation. <br />The Reclamation Plen Mep approximates the location of the <br />Irregular shoreline to be established. <br />E-1 <br /> <br />