My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24827
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:46 PM
Creation date
11/20/2007 5:03:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Hydrology
Doc Date
8/25/1997
Doc Name
HYDROLOGIC & GEOCHEMICAL STUDIES & MODELING FOR CARLTON TUNNEL DISCHARGE PN M-80-244
From
DMG
To
CRIPPLE CREEK & VICTOR GOLD MINING CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ III IIIIIIIIIIIII III <br />STATE OF COLOI~UU <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmern of Natural Resources ~~~~~ <br />1313 Sherman SL, Room 215 <br />Denver, Colorado tl0203 <br />Phone. 13031 866 3567 <br />FAti~. 13031 83?-8106 <br />August 25, 1997 DEPARTMENT OF <br />NATURAL <br />Mr. John Hardaway RESOURCES <br />Cripple Creek & Victor Gold Mining Co. ca a ~oef <br />P. O. Box 191 lames 5. Lxhhead <br />V1Ctor, CO 8086 Eseculive Director <br />Michael B. Lony <br />Division Director <br />RE: Hydrologic and Geochemical Studies and Modeling for <br />Carlton Tunnel Discharge Permit No. M-80-244 <br />Dear Mr. Hardaway: <br />On May 23, 1997, Division personnel met with you, as CC&V representative, and your <br />consultants, Adrian Brown and Shepherd-Miller. <br />The purpose of the meeting was to lay out the framework for hydrologic and geochemical <br />modeling studies that would resolve the issue of potential acid rock drainage in the <br />Carlton Tunnel. During the meeting, the operator and consultants anticipated that the <br />hydrological and geochemical modeling studies would be completed and delivered to the <br />Division by August 1, 1997. To date, the Division has not received the studies. However, <br />you have indicated to me informally that the studies would not be completed until October <br />of 1997. <br />At this time, the Division requests that Cripple Creek and Victor Gold Mining Company <br />provide the studies and models by October 10, 1997. If CC&V cannot provide the <br />requested information by the above date, CC&V will arrange a meeting with the <br />consultants, Division and CC&V to explain the progress of the studies and modeling and <br />to determine how to proceed. <br />If you have additional questions or concerns, please contact me. <br />Sincerely, / <br />~~~~v / <br />Berhan Keffelew <br />Environmental Protection Specialist <br />cc: Michael B. Long <br />Bruce Humphries <br />Jim Stevens <br />Harry Posey <br />M:\ou\ge ~.\Swdiea.bk <br />
The URL can be used to link to this page
Your browser does not support the video tag.