Laserfiche WebLink
r <br />ROADABLE EOUIPNENT: sheet 2 of 2 <br />""""""""" Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />------------------------------------------------------------------------------------------------------- <br />------------------------------------------------------------------------------------------------------- <br />Flatbed truck (debris rec., reveg. eqp.) 534.02 1 134.02 534.02 <br />Subtotals <br />NOB/DEMOB SUPPORT EOUIPNENT: <br />"""""""""""""` Height Ownership Naul Rig Fleet Size <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) <br />NA <br />-------------------------------------------------------------------------------------------------------------------- <br />-------------------------------------------------------------------------------------------------------------------- <br />Subtotals : 10.00 =0.00 =0.00 <br />......... ......... ......... <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (na. hauled) Cost/hr CostJhr <br />------------------------------------------------------------------------------------------------------ <br />NA <br />Subtotals : 10.00 =0.00 <br />------------------------- <br />------------------------- <br />134.02 „=34.02 <br />Haul Trip Return Trip DOT Pereit <br />Cost/hr Cost/hr Cost/ea <br />------------------------------------- <br />------------------------------------- <br />EOUIPNENT HAUL DISTANCE 6 TINE <br />------------------------------ <br />------------------------------ <br />Nearest eajor city or town within project area region: Cortez <br />Total one xaY travel distance = 10.0 eiles. Average travel speed = 40.00 eph. <br />Job Tiee -Non Roadable Equip.= <br />0.50 hours load Roadable Equip. <br />0.45 hours haul <br />0.50 hours unload <br />0.45 hours return <br />--------------------- <br />N/A hours load <br />0.45 hours haul <br />N/A hours unload <br />0.45 hours return <br />JOB COST <br />Total Mob/Deeob Cost = 52,855.50 <br />NOTE: Non-roadable equipeent (haul rig required to transport) cab/deeob casts based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-xay eeptY return. Roadable equipeent (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special pereits for oversize equipeent on certain <br />specified road segeents within the State. Separate pereits are required far each rig on each loaded trip. <br />Additionally, Pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipeent hauling, and loading/unloading tiees cost be increased substantially for equipeent which east be <br />partially diseantled for transport and re-asseebled at the job site. Costs for lifting equipeent and other <br />support equipeent needed for this work should be included in the cob/deeob costs. <br />