Laserfiche WebLink
OURLY-PRODUCTION: <br />Scraper Cycle Tiee <br />.................. <br />Load - 0.9 ein <br />Maneuver 6 spread = 0.6 ein <br />Travel lice (haul 6 return): <br />Haul route <br />Job Condition Correction FaZ~ors <br />Site altitude - 6800 ft. <br />Alt. adjusteent .. 1 <br />Job efficiency ... 0.83 (lsh/d) <br />Net Correction 0.83 <br />Road Length Grade Rolling Total Velocity Travel tioe+ <br />seg. f Ift) res.li) res.li) res.li) Ifpe) (ein) <br />1 300 0.00 6.00 6.00 1490 0.35 <br />Haul lice = 0.35 ein. <br />Return route """"""` <br />...................................................................... <br />1 300 0.00 6.00 6.00 2622 0.29 <br />+lst 6 last seg. adj. for accel./decel <br />Total Cycle Tiee = 2.15 ein. <br />Machine Payload <br />............... <br />Material xeight :2100.00 lbs/LCY <br />Mat. description : """ <br />Earth - Loae <br />Return lice = 0.29 ein. <br />Machine Voluee <br />Struck capacity = 14.00 <br />Heaped capacity = 20.00 <br />Average = 17.00 LCY <br />Rated payload = 48,000 lbs. ~ Adjusted voluee = 17.00 LCY <br />Payload voluee = 22.86 LCY <br />Unadjusted production per scraper or push-pull pair 950.45 LCY/hr <br />Adjusted production 788.87 LCY/hr <br />Adjusted hourly fleet production 788.87 LCY/hr <br />JOB COST: <br />Fleet site 2 Scraper(s) Total Job Tiee: 7.61 Hours <br />Unit Cost (0.405 /LCY Total Job Cost: f2,430 <br />