Laserfiche WebLink
I C ~ III IIIIIIIIIIIII III • <br />Reclamation Cost Estimate <br />(Reclamation Bond Amount) <br />File No. M-97-064 <br />Western Nutrients <br />Agri-Cal #1 <br />Task No. 1 Rough grade mine site, D-8 dozer ~w/ 3 r~^"'k ~~~1'/"~ J <br />2,971.15 <br />rf ~0c~~~r~ <br />sly= / <br />e71 Oc" ~~f_ / <br />UPr„~.c~ as p~SS <br />Task No. 2 Spread 3" of fined over 9.4 acres from tockpiles, 6,180.92 <br />D-8 dozer r =^ 2So~r~<'%~ p~t,~•~~Y3~S, ~- - <br />Task No. 3 "Deliver 3" topsoil to site from Canon City or Penro e) d-~~~rz'N~~35,937.00 <br />3.993 cubic yards $9.001cubic yard delivered ( 1 ~- <br />(N~sY iy'~ J+r v~1 <br />tOr `J I I ws J/1Q <br />Task No. 4 Spread 3" of topsoil over 9.9 acres/ 303.14 <br />Y!r ~ rc Ay way~~q /fG I ~mPr.y/ rf S~r~a/ ov-~ir sue/ C <br />w ~c o,.,- cEu--.-.- jfJ~~S e f 'J~l I4 3 ~ / I <br />Task No. 5 Deliver 8 tons per acre anure to site at $3 90/1ton(;'yG~~jf 237.60 <br />afSr~cr n SPr cat ,.~ fz~L,l,lcl5k 4/ d..eF ~a: K <br />Task No. 6 Site preparation, seed cost, seeding and.fertilizer' 6,853.30 <br />Task No. 7 Mob/DeMob D-8 dozer and farm tractor/seeding <br />equipment 1 I miles from Penrose <br />-., Total Direct Reclamation Costs <br />5% Administrative Fee <br />18.5% Indirect Costs <br />Total Reclamation Costs ~ <br />Financial Warranty Am t~nt! <br />~~ <br />V <br />CsGT~c''ll ~. <br />450.00 ~ <br />52,933.11 <br />2.646.66 <br />55,579.77 <br />10.282.26 <br />65,862.03 <br />65,900.00 <br />~~ <br />t ~ ~ i~ - r, ~~fi~~~ <br />