Laserfiche WebLink
Revision to Section 2.05.4(b) <br />The following costs were used to calculate the reclamation bond. The <br />monthly rental rates were calculated from the Rental Rate Blue Book. <br />Building Removal Costs <br />Concrete Remova] <br />A Cat 235 backhoe will be used for concrete breaking. The cost using the <br />agreed on production will be: <br />67.5 hours @ $120.84 $8,157 <br />Using a Cat 992C front-end loader the loading costs would be: <br />5 hours @ $249.37 $1,247 <br />The concrete can be hauled with a Cat 7736: <br />5 hours @ $130.84 $ 654 <br />• Metal Building Removal <br />Using the approved $.22 per cubic foot of building space, the costs are: <br />Shop-Warehouse 176,000 ft.3 $38,720 <br />Steam Cleaner Building - 1,820 400 <br />$39,120 <br /> <br />751/70/18 Revised January 1985 <br />